17/09/2026
We only do driveways the right way‼️
For this project, we stripped the topsoil down to solid red dirt to build a strong, stable base. In some areas, we went up to 5 feet deep to reach suitable material 🧱
The entrance was designed extra wide for the customer’s new family compound and fine equine training/boarding facility, providing plenty of room for large horse trailers
We also cut 8 feet into the red clay and hauled the material to other areas of the property that required additional fill
This is just the beginning at this property.
Stay tuned for what’s next! 💪🏼