09/29/2020
The big project for August 2020 was a complete floor-to-ceiling kitchen rehab. The project started with removal of the original cabinets, flooring, bulkheads, and rear entry door. Installation of electrical, lighting, and venting rough-ins, drywall patching, application of a new plaster coat on ceilings, with primer and paint throughout, and an increased opening into the adjoining space followed. Finished with installation of new Timberlake cabinetry with quartz tops, farmhouse sink with fixture, ceramic tile backsplash, chrome range hood with matching bi-fuel stove, LVT flooring, under-cabinet, recess, and table lighting, and Permashield sliding door.
The transformation of this space took just about a month, completely changing the interior character of this home. Many thanks to these excellent clients for your understanding and patience. Excelsior!