The clash didn't start during construction.
It started weeks before framing, when two systems were designed without being coordinated.
Every field conflict has a story.
Most of them begin long before anyone steps onto the job site.
Imagine this.
A mechanical supply duct is routed through a space where a structural beam is later detailed.
Both systems work independently.
Together, they can't occupy the same space.
No coordination review catches it before permit submission.
No multidisciplinary coordination meeting takes place.
The issue isn't discovered until construction is already underway.
Now the project team is dealing with:
• Re-routing ductwork
• Reviewing structural impacts
• Revising drawings
• Waiting for updated approvals
• Schedule delays that could have been avoided
The coordination itself wasn't difficult.
Finding it late made it expensive.
That's why we're launching Coordination Failure Friday.
Every Friday, we'll share real-world coordination lessons and common issues seen across commercial construction.
The goal isn't to point fingers. It's to highlight how better coordination early in design can prevent costly problems later in the field.
Because the best time to solve a conflict is before construction begins.
What's one coordination issue you've seen on a project that could have been prevented with earlier collaboration?