Edison XFC

Edison XFC Building A Sustainable Next Generation EV Charging Station Network.

New Year. New Power.Happy New Year — The Future Is On. ⚡️Let’s power up the year ahead.
01/01/2026

New Year. New Power.
Happy New Year — The Future Is On. ⚡️
Let’s power up the year ahead.




Progress Update 🚧From rebar to reality – the equipment platform for our XFC ultrafast public EV charging station is comp...
08/25/2025

Progress Update 🚧

From rebar to reality – the equipment platform for our XFC ultrafast public EV charging station is complete! ⚡Plus, the hardware is in position. 💪

Stay tuned! We’re one step closer to the finish line — building the future of EV charging infrastructure: charging EVs in as little as 10mins. Get Ready!

🌍 Excited to be speaking at EarthX2025 Congress of Conferences hosted by !From April 21–25 in Dallas, we’ll be diving in...
04/15/2025

🌍 Excited to be speaking at EarthX2025 Congress of Conferences hosted by !

From April 21–25 in Dallas, we’ll be diving into the biggest conversations around conservation, clean energy, and environmental policy.
Proud to represent Edison XFC and share our vision for a more sustainable, electrified future. ⚡️

Let’s shape the future—together.

The federal government pulled $110M in EV infrastructure funding.Edison XFC didn’t flinch.While others wait for subsidie...
04/11/2025

The federal government pulled $110M in EV infrastructure funding.
Edison XFC didn’t flinch.

While others wait for subsidies, we’re building an independent, ultra-fast charging network through private partners, state collaboration, and scalable tech.

This isn’t reactive, it’s resilient; because we believe the EV future deserves infrastructure that can’t be overly swayed by policy.

Visit us to learn more: https://www.edisonxfc.com/

Imagine this: the full recommended EV charge of 80% in as little as 10 minutes!That’s not a dream—it’s Edison XFC’s Extr...
04/11/2025

Imagine this: the full recommended EV charge of 80% in as little as 10 minutes!

That’s not a dream—it’s Edison XFC’s Extreme Fast Charging (XFC) technology in action.
We’re not tweaking yesterday’s charging model. We’re replacing it.

🕒 10-minute charge
📍 Deployable in cities, logistics hubs, and travel corridors
🔌 Grid-optimized for sustainability

This is what EV charging should be: quick, accessible, and ready for mass adoption.
Visit us to learn more: https://www.edisonxfc.com/

EV sales are growing, but adoption is hitting a speed bump.  Why?⚠️ Public charging still takes 30–60 minutes.⚠️ Long qu...
04/10/2025

EV sales are growing, but adoption is hitting a speed bump. Why?

⚠️ Public charging still takes 30–60 minutes.
⚠️ Long queues. Frustrated drivers. Stalled progress.

The bottleneck isn’t consumer interest. No, it’s outdated infrastructure that can’t keep up.
That’s where Edison XFC comes in. We’re building the kind of super fast, reliable, scalable network the EV revolution really needs.

Visit us to learn more: https://www.edisonxfc.com/

EV infrastructure is doing more than powering mobility, it’s cleaning the air we breathe.  You do the math:📉 Lower toxic...
04/10/2025

EV infrastructure is doing more than powering mobility, it’s cleaning the air we breathe.
You do the math:

📉 Lower toxic emissions + ❤️ Improved public health = 🌍 Safer, more livable cities
As EVs grow, so does their invisible impact: healthier lungs, safer streets, stronger communities.

🗣 What’s your favorite unexpected benefit of the EV revolution?

The numbers are in—and they are powerful!  🔌 EV charging stations: +50%🚙 EV sales: +10%Even with funding withdrawals and...
04/09/2025

The numbers are in—and they are powerful!

🔌 EV charging stations: +50%
🚙 EV sales: +10%

Even with funding withdrawals and federal hesitation, consumers and cities are choosing electric.

This isn’t just growth, it’s a signal. Clean mobility is winning.
📢 Question: What metric would you track to measure the EV shift?

Major shake-up in U.S. EV infrastructure: The federal government has suspended the NEVI program and eliminated $110 mill...
04/02/2025

Major shake-up in U.S. EV infrastructure: The federal government has suspended the NEVI program and eliminated $110 million in funding. Public EV chargers are being shut down across the country.

It’s a moment of reckoning for the EV movement.
Will this derail progress—or inspire bold leadership from states and the private sector?

💭 The policy has shifted. Now the question is: Who will step up?
We’d say Edison XFC is ready to fill the void. But you tell us👇

🚗⚡️ The EV industry faces a major shift*—federal funding for public chargers is being cut, and the NEVI program is suspe...
03/18/2025

🚗⚡️ The EV industry faces a major shift*—federal funding for public chargers is being cut, and the NEVI program is suspended, losing *$110M. But states like Michigan are stepping up, aiming for 100K chargers by 2030, while private investments in EV infrastructure rise.

Despite setbacks, charging stations grew 50% last year, and EV adoption continues to expand. Reduced emissions and better public health outcomes prove that electrification is the future.

Can state and private efforts fill the gap left by federal rollbacks? Share your thoughts! 🔋⚡️

With deep respect for the legacy of our beloved Dr. Joe Armstrong, we welcome Dr. Chee-Wooi Ten as Edison XFC’s new CTO....
03/12/2025

With deep respect for the legacy of our beloved Dr. Joe Armstrong, we welcome Dr. Chee-Wooi Ten as Edison XFC’s new CTO.

A leader in power systems & cybersecurity, Dr. Ten will help propel our mission of ultra-fast, secure, public EV charging forward.

Dr. Joe would be proud of the progress we’ve made—our first public charging station is taking shape, and the canopy structure is now complete! ⚡🏗️ 📸 Update 1, Update 2 Another major milestone reached!

Dr. Joe’s immeasurable contributions laid the foundation for this success, and under Dr. Ten’s leadership, we will continue moving forward.

Join us in honoring the past while embracing the future—please welcome our new CTO, Dr. Chee-Wooi Ten. 🔗 https://bit.ly/4ikuKqU

The Edison XFC canopy structure is complete! 🏗️ 🎉With the structural inspection in the upcoming week, we’re one step clo...
02/20/2025

The Edison XFC canopy structure is complete! 🏗️ 🎉

With the structural inspection in the upcoming week, we’re one step closer to revolutionizing the speed of public EV charging.

Stay tuned for what’s next! 🚀⚡🎉

Address

330 E. Warm Springs Road, Suite 125
Las Vegas, NV
89119

Alerts

Be the first to know and let us send you an email when Edison XFC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category