10/09/2025
From 60 ton chiller replacements to 200 ton system changeouts and 500 ton water cooled design build projects with a cooling tower, our mechanical division has been operating at full capacity.
Between three of our active projects, our team is managing over 760 tons of cooling capacity across multiple facilities. These projects involve upgrading key mechanical infrastructure to comply with current federal energy codes and state mechanical codes, improving indoor air quality, system reliability, and overall efficiency.
From temporary Trane rental systems to permanent system replacements, each installation is being executed with careful planning, precise coordination, and an emphasis on long-term performance.
Special thanks to Service Manager Cody Wilson and the entire Advantage Contracting, LLC team for their leadership and commitment to quality. It is an honor to work exclusively with such a capable group of professionals.
We also want to recognize Carrier, Chad Tipp, P.E., and Mike Shook, LEED AP for their continued collaboration and engineering support on these projects.