01/10/2026
Raise house on flood plain of St. Croix River, remove rotted concrete block foundation, pour new footings and poured wall, 5 feet fill and compact soil, frame new walls, set house down onto new framing , pour floor. House was raised 14 feet and set back down to meet city required as-built elevation.