02/11/2026
If you or anyone you know is building or remodeling a home, give us a call to give you an estimate on an HVAC system tailored specifically to your home.
Load calculations should always be done when installing ductwork and systems to guarantee the layout and square footage of the home is an appropriate match for the system(s) and ductwork being installed.
At Link Mechanical, every remodel and new construction gets a load calculation that takes into account the sizing of each room, ceiling height, electronics in the home, insulation, windows, etc. All of this plays a factor into the operating efficiency of the HVAC system as a whole.
Most HVAC companies skip this step because it is time consuming and tedious. We do it because it is the right way to do it to maximize efficiency and reduce strain on the system ultimately increasing the life span of the system.
Please feel free to message us on facebook or call or text 804-694-7451 for more information.
Send a message to learn more