Nohr-Way Construction, LLC

Nohr-Way Construction, LLC Licensed Home Contracting services specializing in New builds, Barndominium Builds, Concrete Work, Dirt Work,
Trail Clearing

In a couple weeks we went from nothing to having the land cut and graded for water flow, plumbing under the slab, infloo...
06/05/2026

In a couple weeks we went from nothing to having the land cut and graded for water flow, plumbing under the slab, infloor heat piping, driveway and concrete all poured. Very excited for the next phase, framing.

Some else that I do other than building is mowing. I went as far as I could go by the pond without putting the skid stee...
05/31/2026

Some else that I do other than building is mowing. I went as far as I could go by the pond without putting the skid steer in the water. I did leave some spot for cover because all the waterfowl birds like it.

If you’re in the need of some mowing and want to expand your yard or just want things cleaned up. Let me know. You can message me off of Facebook or get ahold of me by my website Nohrwayconstruction.com

I’m a little late on this post but the infloor piping was stapled down a couple days ago. All the edges have a double ru...
05/28/2026

I’m a little late on this post but the infloor piping was stapled down a couple days ago. All the edges have a double run to ensure the edge stays warm during the winter. My guys use a thicker line also so they can with stand people walking on them and to hold up the best for when concrete gets poured.

More photos to come. The framing will start in about 2 weeks.

Once some dirt has been stripped away, some road base was put down and some sand. My guys really like the blue gravel an...
05/20/2026

Once some dirt has been stripped away, some road base was put down and some sand. My guys really like the blue gravel and believe it holds up the best. The stuff that’s on top is sand, dark blue sand. Same as the blue rock but just crushed down to sand.

The concrete forms are in for a slab on grade with the grade beam dug in. The plumbers were out roughing in all the piping that goes under the slab.

If anyone has any questions about the build, feel free to reach out. More photos to come.

A small little sneak peak of a new construction house build happening. Broke ground last week getting the foundation pre...
05/14/2026

A small little sneak peak of a new construction house build happening. Broke ground last week getting the foundation prepped. More photos to come and more info about the house coming also.

Address

Merrill, WI

Alerts

Be the first to know and let us send you an email when Nohr-Way Construction, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Nohr-Way Construction, LLC:

Share