We may have forgotten to take a before picture, but the after photos speak for themselves.
This project was much more than installing fencing and spreading sand. The property had a significant slope, so the first step was completely regrading the entire hillside to create a level, stable foundation for the arena. Hundreds of cubic yards of material were carefully excavated, moved, and compacted to achieve the proper elevation and ensure long-term stability.
Once the site was properly graded, we installed a complete drainage system to move water away from the arena and prevent standing water or washouts. After establishing a solid foundation, we installed geotextile fabric, placed and fine-graded the base and footing materials, and completed the project with a custom post-and-rail fence and gate.
The result is a professionally built riding ring, built to last.
Thank you to our customers for trusting D.E. Sisk Hardscaping & Construction with another quality project.