11/18/2025
Beginning stages of a kitchen/home remodel. We're progressing along...more pics to come!! Here's a quick summary so far...
Added numerous can lights, ceiling fans, receptacles, and various electrical homeowner requested changes.
Sink converted from a 3 drain to a single, refrigerator water line moved, and gas line stubbed for range. Plumbing ran for small second kitchen sink for future coffee bar.
Floor registers moved to beneath cabinets
Scab 2x4s added to beneath second floor to reduce/eliminate second floor squeaks
Insulated walls and ceiling
Walls are drywalled and taping/mudding is underway!