MAXX HDD

Call Website Contact the business

MAXX HDD Founded in 2015, MAXX HDD is well on it’s way to becoming one of the foremost leaders in the trenchless construction industry.

MAXX HDD was built on the framework and commitment to always have the best equipment, the best people, and the best technology.

When shipping routes move, pipelines may need to be rerouted with them.HDD eliminates the need for trenching, reduces di...
10/16/2026

When shipping routes move, pipelines may need to be rerouted with them.

HDD eliminates the need for trenching, reduces disruption to shipping activities, and helps protect marine ecosystems. It is especially effective for long crossings and difficult ground conditions.

MAXX has completed multiple crossings under ship channels. By offering a precise, trenchless method, HDD ensures safer, more efficient crossings under busy ship channels. Reach out to us to learn more: www.maxxhdd.com.

Some HDD crossings are straightforward. Others require careful planning, the right equipment, and a crew that understand...
10/15/2026

Some HDD crossings are straightforward. Others require careful planning, the right equipment, and a crew that understands how to execute the bore from start to finish.

That’s where MAXX HDD comes in.

From rivers and sensitive areas to tight urban areas, HDD allows pipe to be installed while minimizing disruption at the surface.

MAXX HDD brings the experience, equipment, and field expertise to take on these challenging crossings and keep the project on schedule.

When the crossing is critical, ex*****on matters.

Learn more about our services at https://maxxhdd.com/services/.

The staging area can make or break the project before the drilling even begins. At MAXX HDD, we design every staging are...
10/08/2026

The staging area can make or break the project before the drilling even begins.

At MAXX HDD, we design every staging area to:
• Maximize Efficiency
• Protect Workers & The Public
• Manage Traffic Flow
• Minimize Environmental Impact

Every successful HDD project starts with proper staging. Learn more about MAXX HDD at www.maxxhdd.com

MAXX HDD will be at the APCA Mid-Year Meeting next week in Colorado Springs, Colorado, October 14–17.We are looking forw...
10/07/2026

MAXX HDD will be at the APCA Mid-Year Meeting next week in Colorado Springs, Colorado, October 14–17.

We are looking forward to seeing everyone there!

Expanding our equipment fleet…again.We just added the first-ever Senturion 1590 Polish mud reclaimer from Sentinel Solut...
10/02/2026

Expanding our equipment fleet…again.

We just added the first-ever Senturion 1590 Polish mud reclaimer from Sentinel Solutions to our lineup. The 1590 Polish adds another level of solids control and drilling fluid management to our HDD operations.

Contact us to learn how we can support your next project: [email protected]

Pipe size matters, conditions matter, but proven ex*****on matters most.MAXX HDD has installed a wide range of pipeline ...
10/01/2026

Pipe size matters, conditions matter, but proven ex*****on matters most.

MAXX HDD has installed a wide range of pipeline diameters across varied scopes and environments. Whether it’s a utility line or a large-diameter transmission pipe, our crews are equipped to execute any installation.

No project is too big for MAXX HDD. Contact us today and learn how we can support your next job.

Expert horizontal directional drilling services.HDD has become a preferred method for installing pipelines and utilities...
09/25/2026

Expert horizontal directional drilling services.

HDD has become a preferred method for installing pipelines and utilities, especially where open trenching isn’t feasible or to minimize environmental impact. This includes rivers, urban environments, traffic crossings, and other sensitive areas.

MAXX HDD combines its extensive experience, superior team, and equipment to finish projects safely, on time, and on budget. Our services include:
• Horizontal Directional Drilling
• Slick Boring
• Pipe Extraction
• Design Assistance
• Field Services

Request a quote today for help on your next pipeline construction project.

09/24/2026

620+ Crossings.

84+ Miles.

And we’re still going.



Before an HDD project starts, the site’s geological conditions must be considered. This helps ensure safety and efficien...
09/18/2026

Before an HDD project starts, the site’s geological conditions must be considered. This helps ensure safety and efficiency. But what happens when multiple conditions must be considered?

A midstream operator had 2,796 feet of pipe to be installed in an urban area. The project involved two HDD crossings, one under the Brazos River and the other under Interstate 10. This layout presented two primary challenges.

1. Crossing the Brazos River required precise ex*****on and monitoring because its layers of sand and gravel could affect operations.
2. Crossing a major river and a large interstate simultaneously required meticulous planning to minimize potential delays.

With a powerful DD-440 rig, MAXX HDD successfully completed both crossings, streamlining operations and staying on schedule.

Discover the details of this project here: https://maxxhdd.com/project/tackling-dual-crossings/

Now Hiring: HDD Estimator!The role is a full-time, on-site role based in Navasota, TX, responsible for preparing detaile...
09/18/2026

Now Hiring: HDD Estimator!

The role is a full-time, on-site role based in Navasota, TX, responsible for preparing detailed cost estimates for horizontal directional drilling and related trenchless construction projects.

If you're interested, send your resume to [email protected].

What You’ll Learn & Do:
• Estimate HDD projects from start to finish
• Perform detailed quantity and material takeoffs
• Read and interpret construction drawings, plans, and specifications
• Review project scopes and identify potential risks and challenges
• Assist with developing project bids and proposals
• Research materials, equipment, labor, and subcontractor costs
• Work with HDD superintendents, project managers, and executive leadership
• Help develop production rates and project schedules
• Learn HDD means & methods, tooling, equipment, and construction techniques
• Track bid opportunities and assist with maintaining estimating databases
• Support the team in preparing competitive and accurate proposals

What We’re Looking For:
• Construction, engineering, estimating, or related experience is a plus — but not required
• Strong attention to detail and organizational skills
• Ability to read and understand drawings and plans — or willingness to learn
• Comfortable working with numbers, spreadsheets, and computer software
• Strong communication and problem-solving skills
• Self-motivated with a willingness to learn
• Ability to work in a fast-paced construction environment
• HDD experience is a plus, but we’re willing to train the right person

Address

6155 FM 2445
Navasota, TX
77868

Alerts

Be the first to know and let us send you an email when MAXX HDD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MAXX HDD:

Shortcuts

Share