07/30/2025
Behind the scenes @ BCB Concrete & Construction. Due to some slightly less than ideal circumstances, we were left shoveling 6000LB+ of #57 gravel from a pile I had delivered. If the bed of the dump truck were repaired prior to making my decision to haul the gravel in, then it would've been a perfect world. Tis' not a perfect world and we repaired the bed on a 100° day then shoveled every rock onto the back in one go. Legends have it rock piles near and far quake at the name of Blue Collar Brothers.