05/28/2026
Progress at PS 095Q in Queens: the project's green roof system has been successfully installed and is now undergoing continuous watering to establish the planting bed.
Beyond supporting sustainability and long-term building performance, the green roof helps satisfy NYC energy code requirements (Local Laws 92/94) enforced by DOB.
A great milestone made possible by the dedication of the entire project team.