Turner Construction Company

Turner Construction Company Our People, Our Strength

Amanda CasoMEP EngineerYears with Turner: 5, B.S., Mechanical Engineering
05/12/2022

Amanda Caso
MEP Engineer
Years with Turner: 5

, B.S., Mechanical Engineering

05/11/2022

Turner provided construction management services for the interior fit-out of JetBlue’s new corporate headquarters 27-01 Queens Plaza North in Long Island City, Queens.

The scope of work included the complete fit-out of three floors, totaling 200,000 sq. ft. as well as 30,000 sq. ft. of roof dunnage and equipment installation. The building was originally built in 1911 with an infill building added in 2003, creating two different structural systems. Turner worked around the two existing structural systems to ensure the cohesive feel of JetBlue’s three interconnecting floors.
.newyork

Success is best when it’s shared.
05/09/2022

Success is best when it’s shared.

As Safety Week 2022 winds down, we are reaffirming our commitment to Building L.I.F.E. (Living Injury Free Every day)Thr...
05/06/2022

As Safety Week 2022 winds down, we are reaffirming our commitment to Building L.I.F.E. (Living Injury Free Every day)

Throughout the week, jobsites facilitated discussions that highlight how behavioral health and well-being is so important in keeping ourselves, each other, and our jobsites safe. Thank you to all those who actively participated - today and everyday.

Jonathan Del FierroSenior EstimatorYears with Turner: 22, B.S., Architecture
05/05/2022

Jonathan Del Fierro
Senior Estimator
Years with Turner: 22

, B.S., Architecture

05/04/2022

| The Hearst Corporation Lobby

Turner provided construction management services for this 46-story glass and steel, 858,000 sq. ft. commercial office building for Hearst Corporation. The building was built within and above the original six-story Hearst office building, completed in 1928. The existing 1928 Landmark façade was restored and integrated into the tower, designed by Foster + Partners.

The structural frame, standing 598-feet tall, is enclosed with a panelized glass curtain wall system with stainless steel diagrid cladding. The triangulated steel frame uses 21% less steel than a traditionally framed building, saving 2,000 tons of steel. Hearst Tower is the first commercial building in the United States to receive the Green Building tax credit, and is also registered as a New York State Energy Research and Development Authority (NYSERDA). The project achieved the US Green Building Council’s Leadership in Energy and Environmental Design LEED Gold Designation.

Individually, we are one drop. Together, we are an ocean.
05/03/2022

Individually, we are one drop. Together, we are an ocean.

Thank you to our entire workforce for another week of hard work, construction never quits! If you recognize someone, tag...
04/29/2022

Thank you to our entire workforce for another week of hard work, construction never quits! If you recognize someone, tag them and thank them too!

04/27/2022

| Brooklyn Navy Yard Development Corporation, STEAM Center

Located inside Building 77 at the Navy Yard, Turner completed the construction of the STEAM Center, a 38,700 sq. ft. hub for high-quality Career and Technical Education. Designed by .newyork, the center features computer rooms, learning laboratories, a kitchen, and full production studio. The 6-month project was completed on behalf of the

Working alongisde Brooklyn Navy Yard Development Corporation (BNYDC)'s consultants, the team carefully planned the structural upgrades to safeguard the building’s integrity prior to completing the demolition of the 6,000 sq. ft. slab on the 4th floor. The team’s pre-planning efforts extended to the fit-out of the kitchen. Due to limited ceiling height, the coordination and phasing of equipment installation was vital to ensuring the project remained on schedule.newyork

Every accomplishment starts with the decision to try.
04/25/2022

Every accomplishment starts with the decision to try.

Happy Earth Day!🌎On behalf of Empire State Development, a Lendlease / Turner joint venture with tvsdesign provided desig...
04/22/2022

Happy Earth Day!🌎

On behalf of Empire State Development, a Lendlease / Turner joint venture with tvsdesign provided design-build services for the expansion of the Jacob K. Javits Convention Center. The $1.5 billion project will generate millions of dollars in new economic activity for New York City, while serving as a model of environmental efficiency and sustainability.

The 1.2 million square-foot expansion includes several innovative concepts to push the boundaries of sustainability and create a path for future initiatives. Since 2014, the Javits Center has reduced the building’s energy consumption by 26%, created a rooftop wildlife habitat and installed energy-efficient equipment throughout the structure on Manhattan’s West Side. The innovative design has enabled the expansion to achieve LEED Gold certification from the U.S. Green Building Council.

Completed in 1957, the scope of work included the construction of a massive headquarters building for the Connecticut Ge...
04/22/2022

Completed in 1957, the scope of work included the construction of a massive headquarters building for the Connecticut General Life Insurance Company.

Designed by SOM, the building’s programming takes uniquely horizontal ex*****on, and feature landscaped gardens, new roadways and pedestrian walkways.

Address

375 Hudson Street
New York, NY
10014

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+12122296000

Alerts

Be the first to know and let us send you an email when Turner Construction Company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Turner Construction Company:

Share