09/23/2026
Foundation is in! Clean #2 stone is placed around the footer, the footer drain tile is piped through the existing foundation, and the interior is filled with clean #2 stone. The concrete was tested to meet Amherst code requirements.
Ready for the next phase. Stay tuned! Give us a call for a free estimate. 716-432-5402