07/26/2025
This ice cream truck's refrigeration system blew the compressor. The job involved craning in and out the new compressor, upgrading from 240v single phase to a 3 phase 208v system, all new electrical wiring, and all new controls. The condensing unit is above the truck cab. The system cools to -20f using 3 TXVs and 4 large cold plates in the box. It was a very interesting job.