16/05/2022
Last week we wrapped up a partial basement finish that’s been in the works for some time! Another contractor started the bedroom and bathroom in 2020 - and we were brought in to correct some issues and finish the project. Swipe through to see the before pictures!
As always, a huge thank you to our vendors and contractors for their awesome work!
Electric - Gallahan Electric
Plumbing - Kahar Plumbing
Tile - JS Installations
Drywall - Dan Langston Drywall
Paint - Chameleon Paint Works
Flooring - Masters Petersens Flooring & Interior Design, LLC
Everything else by none other than Matt Tanner himself!
Vanity, mirror, barn door from Wayfair
Light, toilet, faucet, shower fixtures and sliding door, hardware, ceiling fan, and tile from The Home Depot