Native Home Builders LLC

  • Home
  • Native Home Builders LLC

Native Home Builders LLC Residential construction and remodeling.

This cute FRESHLY PAINTED! 2bed 2bath (both rooms are en-suite rooms) is ready to show, I am having an open house this S...
19/06/2024

This cute FRESHLY PAINTED! 2bed 2bath (both rooms are en-suite rooms) is ready to show, I am having an open house this Saturday. Feel free to come see me from 10-1 or for a private showing gift me call! It’s a perfect started home, as it was for this seeet couple, or a good place to downsize and settle it with no yard responsibilities and still having a green (except for part of summer! 🤪) grassy space right out your front door! Check it out!

Newly painted! AND conveniently located near Cardinals Stadium, Westgate Center, Top Golf, the new VAI Resort, and a variety of restaurants, this upgraded unit offers modern comfort and convenience. Featuring 2 bedrooms and 2 baths with a split floorplan, enjoy ample closet space. This unit boasts n...

This is that same North Phoenix home remodel, the bathroom progress so far, love the inclusion of a bench in the shower....
09/08/2023

This is that same North Phoenix home remodel, the bathroom progress so far, love the inclusion of a bench in the shower. While it’s not for everyone, the homeowner opted to do away with the bathtub and they used the extra space to create more needed storage in the bathroom. What do you think?

Here is a house in North Phoenix that is being remodeled. Some before and during construction/remodel photos. More to co...
08/08/2023

Here is a house in North Phoenix that is being remodeled. Some before and during construction/remodel photos. More to come!!

Check out this cute house, gas stove, RV gate!! It’s going to be someone’s new home sweet home, who is it going to be?
01/09/2021

Check out this cute house, gas stove, RV gate!! It’s going to be someone’s new home sweet home, who is it going to be?

Here is your next house!! This cute house is perfect for first-time owners or downsizers. New paint inside and out, new window coverings, new block-fence in backyard, new water heater, roof is only 5 years old. Tile through common areas, with carpet in bedrooms...and brand new carpet in the master r...

The newest project completed, our niece loves her new pallet bed frame.
10/04/2021

The newest project completed, our niece loves her new pallet bed frame.

And its DONE!! a snippet of the beginning to the end.
29/01/2020

And its DONE!! a snippet of the beginning to the end.

We finally received the long awaited shelves for the unit Frank has been building, and the Super was right there making ...
25/01/2020

We finally received the long awaited shelves for the unit Frank has been building, and the Super was right there making sure all was going according to specifications! Whew! Cori K Jeide

His little helper sure was curious today. She got right in there making sure he had the trim in the right place. 💕 curre...
27/11/2019

His little helper sure was curious today. She got right in there making sure he had the trim in the right place. 💕 current status, cabinets installed, trimmed out and waiting for the custom shelves and counter to be installed.

We took the weekend off, and Monday and forgot to post yesterday. But here is the update on the entertainment wall. Text...
14/11/2019

We took the weekend off, and Monday and forgot to post yesterday. But here is the update on the entertainment wall. Textured and painted. A few touch ups to do and shelves to be installed once they are created. Final to be posted once it's all done!
Native Home Builders LLC Native Homes AZ

Day 4 doesn’t show much in the way of visual changes but the last layer of drywall mud it on and texture coming to a wal...
09/11/2019

Day 4 doesn’t show much in the way of visual changes but the last layer of drywall mud it on and texture coming to a wall near us... (after we celebrate Veteran’s Day!)

Oh, and today’s supervisor was not as demanding of attention but still watched to make sure he got it right.

Back at it Tuesday!

Day three, the boss was on top of him getting him started. (She gave him a little space later on) 💗Joints are mudded and...
08/11/2019

Day three, the boss was on top of him getting him started. (She gave him a little space later on) 💗
Joints are mudded and drying. Getting closer to the finished product. I forgot to get a picture of Cori trying her hand at applying drywall mud. She got the hang of it pretty quickly.

Address

83rd Avenue And Camelback
AZ

Opening Hours

Monday 07:00 - 17:00
Tuesday 07:00 - 17:00
Wednesday 07:00 - 17:00
Thursday 07:00 - 17:00
Friday 07:00 - 17:00
Saturday 09:00 - 17:00

Telephone

+16237643681

Website

Alerts

Be the first to know and let us send you an email when Native Home Builders LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Native Home Builders LLC:

  • Want your business to be the top-listed Engineering Company?

Share