Condo Milestone Structural Inspections, PLLC

Website Contact the business

Condo Milestone Structural Inspections, PLLC CMSI performs Condominium Milestone Inspections per Florida Bill SB 154 (formerly SB 4-D).

https://www.facebook.com/share/19RHjCwgV2/?mibextid=wwXIfr
09/28/2026

https://www.facebook.com/share/19RHjCwgV2/?mibextid=wwXIfr

Jeddah Tower has now reached 113 floors — and it still isn’t even halfway to its planned height.

Construction on the Saudi megatall has climbed to approximately 454 meters (1,490 ft), according to the Council on Vertical Urbanism. At that height, the unfinished tower has already surpassed the 451.9-meter architectural height of the Petronas Towers in Kuala Lumpur.

Designed by Adrian Smith + Gordon Gill Architecture, Jeddah Tower is planned to rise more than 1,000 meters, making it significantly taller than Dubai’s 828-meter Burj Khalifa if completed as designed. Construction resumed in 2025 after a years-long pause.

📍 Jeddah, Saudi Arabia
🏗️ Current level: 113 floors
📏 Current height: ~454 m / 1,490 ft
🎯 Planned height: 1,000+ m

09/27/2026
09/26/2026

I’ve invested in it BXBL 🙏

Address

West Palm Beach, FL

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Condo Milestone Structural Inspections, PLLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Condo Milestone Structural Inspections, PLLC:

Shortcuts

Share