Valley Trail Construction

Valley Trail Construction Specialists in residential and light commercial excavation.

Two 40 foot flagpoles we installed yesterday!
09/02/2026

Two 40 foot flagpoles we installed yesterday!

The start of 12,000 linear feet of downspouts / roof drains!
08/18/2026

The start of 12,000 linear feet of downspouts / roof drains!

Some of our more recent work:- Wood siding install at Malabar Farms- Final grade and seed/straw for an addition- Drivewa...
08/04/2026

Some of our more recent work:

- Wood siding install at Malabar Farms

- Final grade and seed/straw for an addition

- Driveway install and grade work in town

- Final grade for drainage job at Frito Lay

- Floor joist reinforcement at Malone University

- LVT, baseboard, and paint job for Bear Hugs

- Creek clean out and driveway rework

- Clearing job with surface water management

Pulling T posts from this temp fence we threw up on this assisted living project as it gets wrapped up. Thankful to of h...
07/28/2026

Pulling T posts from this temp fence we threw up on this assisted living project as it gets wrapped up. Thankful to of had a wide variety of work on this job from digging the irrigation sleeves, continuous grading work, and putting in the fence.

Working on a fun drainage project here at Frito Lay, approximately 600 feet of drain tile to keep this back yard dry, an...
06/17/2026

Working on a fun drainage project here at Frito Lay, approximately 600 feet of drain tile to keep this back yard dry, and a basin to be set in another location of the property!

Beautiful day for final grade!
06/03/2026

Beautiful day for final grade!

Beautiful day to dig footers ☂️ thankfully the rain quit and we were able to get them dug for this future sunroom/additi...
05/20/2026

Beautiful day to dig footers ☂️ thankfully the rain quit and we were able to get them dug for this future sunroom/addition.

The original creek crossing here was one 36 inch pipe. After torrential downpour the pipe lifted and washed away. We cam...
05/18/2026

The original creek crossing here was one 36 inch pipe. After torrential downpour the pipe lifted and washed away. We came in and mucked out the whole creek, put two 36 inch pipes in so water isn’t converging so much in one spot, and capped the whole thing in 1’s & 2’s.

Attic access panels going in today at Malone University
05/14/2026

Attic access panels going in today at Malone University

Mucked out this creek/pond overflow that was backed up with silt.
05/11/2026

Mucked out this creek/pond overflow that was backed up with silt.

Address

Wooster, OH
44691

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+13306416328

Alerts

Be the first to know and let us send you an email when Valley Trail Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share