19/06/2024
Staging area for 60" HDPE pipes for storm water detention system for a residence. We have to plan out how to cut and join the pipes together while having the minimum amount of waste, since these pipes are very expensive.
In the second photo, we have the pit excavated and we are beginning laying down the pipes. Positioning them while working with tight space constraints, getting ready to install stabilized sand to seat the pipes in the ground permanently!