15/11/2024
Started new bathroom Monday.
1st full rip out and full refit, all the plumbing, plastering and tiling done by me. Plastering over old artex ceiling.
My mate Paul for the electrics which was completed 1st fix today.
This one is going to have P shaped bath, new toilet, sink and rad. 3 way control for the water feed for the rainforest shower, hand held and tapless bath, UF electric heating system with exterior thermostat, floating sink cabinet LED lit, LED lit PIR sensor wall hung cabinet above, tiles are 600 x 300 grey porcelain & the same size in bone colour with horizontal mosaic border, all mitred and resin edged.
Few snags at the rip out shower valve being too big and the cistern being broke in transit but making a move with this now. Tiling next week after the 1st fix plumbing completed.
💪