Heerema Marine Contractors

  • Home
  • Heerema Marine Contractors
Call Website

Heerema Marine Contractors Heerema Marine Contractors transports, installs, and removes all types of offshore facilities.

Heerema Marine Contractors (HMC) brings over half a century of specialized skills to the offshore energy industry.

We are proud of our excellence in project management and engineering, our passionate workforce and a fleet that includes formidable heavy lift and deep water construction vessels.

08/09/2026

🌍 𝗛𝗲𝗲𝗿𝗲𝗺𝗮 𝗠𝗮𝗿𝗶𝗻𝗲 𝗖𝗼𝗻𝘁𝗿𝗮𝗰𝘁𝗼𝗿𝘀 𝗶𝘀 𝗼𝗽𝗲𝗻𝗶𝗻𝗴 𝗮 𝗻𝗲𝘄 𝗲𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴 𝗼𝗳𝗳𝗶𝗰𝗲 𝗶𝗻 𝗣𝗼𝗿𝘁𝗼, 𝗣𝗼𝗿𝘁𝘂𝗴𝗮𝗹. 
Engineering expertise is at the heart of every project we deliver. With its strong engineering community, international outlook, and growing reputation as a technology and innovation center, Porto is a natural fit for Heerema’s global organization.

This new office brings us closer to talented professionals who will help shape the future of offshore energy projects around the world. We’re excited to welcome new colleagues, build local connections, and become part of Porto’s vibrant engineering community.

Olá Porto, aqui vamos nós!

04/09/2026

𝟵𝟱,𝟬𝟬𝟬 𝘁𝗼𝗻𝗻𝗲𝘀 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗲𝗱, 𝗳𝗶𝘃𝗲 𝘆𝗲𝗮𝗿𝘀 𝗼𝗳 𝗽𝗿𝗲𝗽𝗮𝗿𝗮𝘁𝗶𝗼𝗻𝘀, 𝘁𝗵𝗿𝗲𝗲 𝘆𝗲𝗮𝗿𝘀 𝗼𝗳 𝗲𝘅𝗲𝗰𝘂𝘁𝗶𝗼𝗻 𝗮𝗻𝗱 𝗼𝗻𝗲 𝗺𝗮𝘀𝘀𝗶𝘃𝗲 𝗳𝗶𝗻𝗮𝗹 𝗹𝗶𝗳𝘁 𝗳𝗼𝗿 𝗦𝗹𝗲𝗶𝗽𝗻𝗶𝗿 💪

With the successful installation of the more than 16,500 tonne Production Wellhead Platform (PWP) topside, Heerema Marine Contractors has completed its offshore ex*****on scope for Aker BP ASAs Yggdrasil and Valhall PWP-Fenris developments.

Our project teams, the crews of Sleipnir and Bylgia, operational teams, and many colleagues across the organization delivered a complex, integrated program involving transportation, lifting, and installation scopes across multiple fabrication yards in Europe and offshore campaigns on the Norwegian Continental Shelf.

The final campaign, executed by Sleipnir and supported by Bylgia, demonstrates the power of teamwork, technical expertise, and operational excellence. While the PWP topside installation marks the end of this journey, it also reflects many years of teamwork and planning. 

Congratulations and thank you to and partners, our subcontractors, and the many colleagues and partners who contributed to this achievement. 🤝

🎥 by Aker BP & Woldcam

20/08/2026

Sleipnir did it again 💪

One unmanned topside of 9,000 tonnes and a 108 meter long flare.

Both installed safely within 24 hours onto the Jacket which was fabricated by and installed by Sleipnir last year.

Maximum control, safely executed.

Congratulations to and on the installation of the Munin platform.

A result made possible by years of engineering, thorough onshore preparation, and teamwork, brought together in another successful offshore campaign for the Yggdrasil development. 

A special thanks to our Sleipnir crew, client and all involved in this successful installation. 🤝

🎥 by &

14/07/2026

𝗪𝗶𝘁𝗵 𝘁𝗵𝗲 𝗰𝗲𝗿𝗲𝗺𝗼𝗻𝗶𝗮𝗹 𝗱𝗶𝘀𝗽𝗼𝘀𝗮𝗹 𝗼𝗳 𝘁𝗵𝗲 𝗳𝗶𝗻𝗮𝗹 𝗽𝗶𝗲𝗰𝗲 𝗼𝗳 𝘀𝘁𝗲𝗲𝗹, 𝘁𝗵𝗲 𝗳𝗶𝘃𝗲-𝘆𝗲𝗮𝗿 𝗤𝟭 𝗱𝗲𝗰𝗼𝗺𝗺𝗶𝘀𝘀𝗶𝗼𝗻𝗶𝗻𝗴 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝗳𝗼𝗿 𝗵𝗮𝘀 𝗿𝗲𝗮𝗰𝗵𝗲𝗱 𝗶𝘁𝘀 𝗰𝗼𝗻𝗰𝗹𝘂𝘀𝗶𝗼𝗻! 👏
From the Helm, Haven, Helder, Hoorn and Horizon facilities, a total of approximately 25,000 metric tons of offshore infrastructure has now been safely dismantled and processed in the Netherlands.

Projects like these are only successful through strong partnerships. As a trusted decommissioning partner, we’re proud to have worked closely with Petrogas, .infra.milieu.sloop , and the many subcontractors and specialists who contributed their expertise throughout the project. Together, we ensured that every phase, from offshore removal to onshore dismantling, was executed safely, responsibly and efficiently.

An important outcome: approximately 98% of the material is being recycled through various waste streams, giving these assets a new purpose. ♻️

A sincere thank you to Petrogas for their trust and collaboration, and to Sagro and all project partners who helped make this achievement possible. 🤝

𝗢𝗳𝗳 𝘁𝗼 𝗮 𝘀𝘁𝗿𝗼𝗻𝗴 𝘀𝘁𝗮𝗿𝘁: 𝟮𝟯 𝗳𝗼𝘂𝗻𝗱𝗮𝘁𝗶𝗼𝗻𝘀 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗲𝗱 𝗯𝘆 𝗧𝗵𝗶𝗮𝗹𝗳 𝗮𝘁 𝗕𝗮ł𝘁𝘆𝗸 𝟮 & 𝟯.  In the Baltic Sea, our crew has officially k...
27/05/2026

𝗢𝗳𝗳 𝘁𝗼 𝗮 𝘀𝘁𝗿𝗼𝗻𝗴 𝘀𝘁𝗮𝗿𝘁: 𝟮𝟯 𝗳𝗼𝘂𝗻𝗱𝗮𝘁𝗶𝗼𝗻𝘀 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗲𝗱 𝗯𝘆 𝗧𝗵𝗶𝗮𝗹𝗳 𝗮𝘁 𝗕𝗮ł𝘁𝘆𝗸 𝟮 & 𝟯.

In the Baltic Sea, our crew has officially kicked off offshore installation for the Bałtyk 2 & 3 projects – and what a start it’s been. With 23 monopiles already safely installed using our high-tech Motion Compensated Gripper Frame, the campaign is off to a flying start.

But technology is only part of the story.

This milestone reflects years of preparation and the dedication of an incredible offshore crew, working around the clock alongside a large supporting fleet. It also highlights the strength of our collaboration with and , as we moved together into full offshore ex*****on.

Together with 15 support vessels and the project teams onshore, we’re contributing to one of Poland’s largest offshore wind developments – a project that will power millions of homes and accelerate the energy transition. ⚡

A great achievement, and an exciting journey ahead. 💪

20/04/2026

𝗢𝘂𝗿 𝗺𝗶𝗴𝗵𝘁𝘆 𝗦𝗦𝗖𝗩 𝗦𝗹𝗲𝗶𝗽𝗻𝗶𝗿 𝗵𝗮𝘀 𝘀𝘂𝗰𝗰𝗲𝘀𝘀𝗳𝘂𝗹𝗹𝘆 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗲𝗱 𝘁𝗵𝗲 𝗳𝗶𝗳𝘁𝗵 𝗮𝗻𝗱 𝗳𝗶𝗻𝗮𝗹 𝗷𝗮𝗰𝗸𝗲𝘁 𝗳𝗼𝗿 𝘁𝗵𝗲 𝗬𝗴𝗴𝗱𝗿𝗮𝘀𝗶𝗹 & 𝗩𝗮𝗹𝗵𝗮𝗹𝗹 𝗣𝗪𝗣‐𝗙𝗲𝗻𝗿𝗶𝘀 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝗳𝗼𝗿 . 🏗️ 🌊
Following the installation of the Fenris jacket in 2024 and the Valhall PWP, Hugin‑A and Munin jackets in 2025, Sleipnir has now completed the installation of the Hugin‑B jacket.

The Hugin-B Jacket, weighing around 4,500 metric tons and standing 146 meters tall, was carefully towed from Verdal, moored against Sleipnir, lifted, upended and carefully set down on the seabed. Installation was completed by pile driving, grouting and completion activities.

A true heavy lift operation from start to finish, executed step-by-step thanks to strong teamwork offshore and onshore. 👷

Great work by everyone involved! And with Sleipnir not finished yet in the Yggdrasil field, there’s more to come: four topsides and two flares are still scheduled for installation.

Heerema Marine Contractors is gearing up for the WindEurope Exhibition & Conference in Madrid - less than two weeks to g...
09/04/2026

Heerema Marine Contractors is gearing up for the WindEurope Exhibition & Conference in Madrid - less than two weeks to go!

Interested in discussing your offshore substation project? Curious about the capabilities of our Motion Compensated Gripper Frame or one of our vessels? Or looking to streamline the installation of WTG foundations as efficiently as possible?

📍 Visit our stand at 𝟵-𝗛𝟱𝟬 and connect with our specialists.

We look forward to seeing you there!

📷 by ibeler for RWE at Nordseecluster

Fantastic views from Norway earlier this week. 👀 Sleipnir, named after Odin's legendary eight-legged horse, and Balder, ...
03/04/2026

Fantastic views from Norway earlier this week. 👀

Sleipnir, named after Odin's legendary eight-legged horse, and Balder, named after the Norse god of light and purity - both preparing for their next projects in the Åmøy fjord. ⚓🇳🇴

📷 by

𝗦𝗹𝗲𝗶𝗽𝗻𝗶𝗿 𝗖𝗼𝗺𝗽𝗹𝗲𝘁𝗲𝘀 𝗛𝗼𝗿𝗻𝘀𝗲𝗮 𝟯 𝗟𝗶𝗻𝗸 𝟭 𝗜𝗻𝘀𝘁𝗮𝗹𝗹𝗮𝘁𝗶𝗼𝗻 𝗔𝗵𝗲𝗮𝗱 𝗼𝗳 𝗦𝗰𝗵𝗲𝗱𝘂𝗹𝗲 💪 🌊 The Sleipnir crew has successfully completed the ...
31/03/2026

𝗦𝗹𝗲𝗶𝗽𝗻𝗶𝗿 𝗖𝗼𝗺𝗽𝗹𝗲𝘁𝗲𝘀 𝗛𝗼𝗿𝗻𝘀𝗲𝗮 𝟯 𝗟𝗶𝗻𝗸 𝟭 𝗜𝗻𝘀𝘁𝗮𝗹𝗹𝗮𝘁𝗶𝗼𝗻 𝗔𝗵𝗲𝗮𝗱 𝗼𝗳 𝗦𝗰𝗵𝗲𝗱𝘂𝗹𝗲 💪 🌊

The Sleipnir crew has successfully completed the installation of the Hornsea 3 Link 1 Jacket and the Offshore Converter Station (OCS1).

These lifts showcased safe, efficient, and precise ex*****on under typical North Sea conditions, supported by strong coordination across project management, engineering, and marine operations. Our project teams in Houston and Leiden, together with the crews of Sleipnir, Bylgia, Kolga, Island Champion, and Boulder, delivered exceptional performance throughout the operation.

With Link 1 now in place, we’re looking forward to installing the Offshore Converter Station 2 (OCS2) later this year, reinforcing our commitment to supporting Aibel and Ørsted in delivering large‑scale offshore renewable energy infrastructure.

𝗢𝘂𝗿 𝗦𝗦𝗖𝗩 𝗦𝗹𝗲𝗶𝗽𝗻𝗶𝗿 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗲𝗱 𝗵𝗲𝗿 𝗳𝗶𝗿𝘀𝘁 𝗡𝗼𝗿𝘁𝗵 𝗦𝗲𝗮 𝗰𝗮𝗺𝗽𝗮𝗶𝗴𝗻 𝗼𝗳 𝟮𝟬𝟮𝟲 𝘄𝗶𝘁𝗵 𝘁𝗵𝗲 𝘀𝘂𝗰𝗰𝗲𝘀𝘀𝗳𝘂𝗹 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗮𝘁𝗶𝗼𝗻 𝗼𝗳 𝘁𝗵𝗲 TenneT 𝗕𝗼𝗿𝗪𝗶𝗻𝟲 ...
20/03/2026

𝗢𝘂𝗿 𝗦𝗦𝗖𝗩 𝗦𝗹𝗲𝗶𝗽𝗻𝗶𝗿 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗲𝗱 𝗵𝗲𝗿 𝗳𝗶𝗿𝘀𝘁 𝗡𝗼𝗿𝘁𝗵 𝗦𝗲𝗮 𝗰𝗮𝗺𝗽𝗮𝗶𝗴𝗻 𝗼𝗳 𝟮𝟬𝟮𝟲 𝘄𝗶𝘁𝗵 𝘁𝗵𝗲 𝘀𝘂𝗰𝗰𝗲𝘀𝘀𝗳𝘂𝗹 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗮𝘁𝗶𝗼𝗻 𝗼𝗳 𝘁𝗵𝗲 TenneT 𝗕𝗼𝗿𝗪𝗶𝗻𝟲 𝗷𝗮𝗰𝗸𝗲𝘁 𝗶𝗻 𝘁𝗵𝗲 𝗚𝗲𝗿𝗺𝗮𝗻 𝗡𝗼𝗿𝘁𝗵 𝗦𝗲𝗮 𝗼𝗻 𝗯𝗲𝗵𝗮𝗹𝗳 𝗼𝗳 McDermott International, Ltd. 🌊 🏗️

The steel structure, nearly 5,000 mT, is now securely fixed to the seabed with 10 piles, preparing the site for the topside float over later this year.

This campaign was delivered through close cooperation, with all activities planned and executed in line with stringent German offshore regulations, including strict underwater noise limits during piling and specific grouting requirements.

This installation marks a key step toward completing the BorWin6 grid connection, helping bring more offshore wind power into the German energy system.

We’re proud of the teams offshore and onshore, and grateful to McDermott and TenneT for their trust and partnership. 🤝

Address


Alerts

Be the first to know and let us send you an email when Heerema Marine Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

  • Want your business to be the top-listed engineering company?

Share