The DOers

The DOers Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from The DOers, .

Examples of February projects:Completed Basement RemodelAdded Roof Vent, Soffit Vents, and Fixed Flashing Around Chimney...
03/03/2025

Examples of February projects:

Completed Basement Remodel
Added Roof Vent, Soffit Vents, and Fixed Flashing Around Chimney
Replaced Bathroom Drop Ceiling Grid and Tiles
Fixed Gutters at Sheboygan Falls Post Office
Repaired Broken and Falling Threshold Under Outside Door

Most of this month the DOers have been DOing siding and inside trim.  Watch for our home improvement newletter coming so...
18/01/2025

Most of this month the DOers have been DOing siding and inside trim. Watch for our home improvement newletter coming soon.

18/01/2025
Project Update: Gutters cleaned, downspouts unplugged, leaks fixed, and gutter guards installed on six buildings
24/11/2024

Project Update: Gutters cleaned, downspouts unplugged, leaks fixed, and gutter guards installed on six buildings

16/11/2024

Trifold Brochure V1.0

Added old wagon display and fence to yard
09/11/2024

Added old wagon display and fence to yard

Late night to complete a rush job to pour 50 cement footings for posts. Rigged up a cement mixer and slide to riding mow...
09/11/2024

Late night to complete a rush job to pour 50 cement footings for posts. Rigged up a cement mixer and slide to riding mower for efficiency 😉

Replaced deck, railings, lattice, and rotted stair stringers with low-maintenance composite. Stairs were widened and str...
09/11/2024

Replaced deck, railings, lattice, and rotted stair stringers with low-maintenance composite. Stairs were widened and stretched for gentler climb. Old deck boards were used to build platform under deck for storage and door was added for access.

Remodeled bathroom. Took walls down to studs, removed old fixtures and flooring, insulated, hung and finished drywall, m...
04/11/2024

Remodeled bathroom. Took walls down to studs, removed old fixtures and flooring, insulated, hung and finished drywall, moved showerhead higher, added electrical outlet and new circuit, modified plumbing for new fixtures, installed tub & shower surround, cabinet, medicine cabinet, lights, bath fan, rods, fixtures, and tile floor

Tore off three season porch, framed patio door, installed siding, and built stairs
04/11/2024

Tore off three season porch, framed patio door, installed siding, and built stairs

Address


53081

Alerts

Be the first to know and let us send you an email when The DOers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to The DOers:

  • Want your business to be the top-listed Engineering Company?

Share