Econergy Civils

Econergy Civils Solar Energy design and installation
Biodigester design and construction
Civil Engineering Civil Engineering: Infrastructure design and construction.

We are a renewable energy and civil engineering company offering a wide range of services, including:

Renewable Energy: Solar installations, solar pumping, solar backup systems, and biodigester construction. Water Reticulation: Network design and construction. At Econergy Civils, we pride ourselves on building long-term client relationships by providing exceptional service and support. We are com

mitted to quality, safety, and sustainability. With years of industry experience, our expert team consistently delivers top-notch services, ensuring projects are completed on time and efficiently.

A. Key aspects of quality tank fabrication include:1. Material selectionChoosing the appropriate metal alloy  based on t...
28/01/2025

A. Key aspects of quality tank fabrication include:

1. Material selection

Choosing the appropriate metal alloy based on the intended use and environmental conditions to ensure corrosion resistance and structural integrity.

2. Precise design engineering

Creating detailed plans with accurate dimensions and calculations to optimize tank functionality and safety.

2. Skilled craftsmanship

Employing experienced welders and fabricators who can execute precise cuts, welds, and assembly techniques.

3. Multiple quality checks

Performing thorough inspections at every stage of fabrication, including material testing, dimensional checks, and non-destructive testing (NDT) like radiography or ultrasonic testing to identify potential flaws.

4 Adherence to industry standards

Following recognized codes and regulations to guarantee tank quality and safety.

B. Why is quality important in tank fabrication?

1.Safety

A poorly fabricated tank can lead to leaks, spills, or structural failures, posing safety risks to personnel and the environment.

2. Lifespan

A well-fabricatef tankstand will last longer and require less maintenance over its lifetime.

Health and Safety has NO.shortcuts

The pictures attached are part of work in nyimba at mchimadzi clinic Nyimba District.

Chelston Secondary School Project updates1. Construction of Biodigester lintol level2. Construction of Anaerobic Baffled...
11/01/2025

Chelston Secondary School Project updates
1. Construction of Biodigester lintol level
2. Construction of Anaerobic Baffled Reactor underway
3. Rehabilitation of girls and boys ablution to be ready by Sunday afternoon
4. Tankstand completed. Painting to start on simday 11th January

Thanks Econergy Civils Econergy Civils team for the PUSH

11/01/2025

2025 for another PUSH

As we start a new year 2025 we want to take a moment to express our heartfelt gratitude to you our Clients  for the oppo...
31/12/2024

As we start a new year 2025 we want to take a moment to express our heartfelt gratitude to you our Clients for the opportunity to work with you in 2024. Your trust and support have meant the world to us.

We're honored to have had the chance to help you achieve your goals and look forward to continuing our partnership in the years to come.

Wishing you a joyous holiday and a happy, prosperous New Year!
To our Team Econergy Civils growth doesn't happen in one day because it's a process that requires hard work, consistency, and patience. It's a journey that involves sacrifice and resilience, and it's not automatic. You create enemies and and friends along the way but BE POSITIVE and see what others can't see.

Econergy Civils  is happy to have been part of the team at handover  of maternity wing, ablution blocks and Dewats at Ka...
22/12/2024

Econergy Civils is happy to have been part of the team at handover of maternity wing, ablution blocks and Dewats at Kanyama West Clinic. Thanks to PMI Project Management institute & Living Waters International for the great project that brings Social Impact to the community.

Update on DEWATS CONSTRUCTION Chelston Secondary School . Construction of 100m3 Biodigester and Construction of a 13x10m...
20/12/2024

Update on DEWATS CONSTRUCTION Chelston Secondary School . Construction of 100m3 Biodigester and Construction of a 13x10m ABR is going as planned. Premix concrete was successfully placed on a heavily reinforced base 13mx10mx200mm Base C30. Thanks to our hardworking team.

SACRED SISTERS RHODES PARK LUSAKAAN OVERVIEW OF THE Water Purification System installedIron Removal: Sand Filters and DM...
03/12/2024

SACRED SISTERS RHODES PARK LUSAKA
AN OVERVIEW OF THE Water Purification System installed

Iron Removal: Sand Filters and DMI-65

Sand Filters:
o Sand filters remove suspended solids, sediment, and particulates from the water, acting as a preliminary filtration step.

o These filters are effective for reducing turbidity and preparing water for further treatment stages.

DMI-65 Media:
o A specialized catalytic filtration media designed to remove iron, manganese, and other heavy metals from water.

o DMI-65 is activated by chlorination (using an inline chlorinator, like Klorman), which oxidizes dissolved iron into particulate form, making it easier to filter out.

o The media also helps remove manganese and arsenic if present in trace amounts.

Jumbo Filters (20-inch): Activated Carbon and Polyphosphate Crystals

Activated Carbon:
o Removes chlorine, organic compounds, and any residual taste or odor from the water.

o It also filters out some small particles and impurities that could affect water quality.

Polyphosphate Crystals:
o These prevent calcium and magnesium in water from precipitating as scale on surfaces.

o They work as a scale inhibitor by sequestering the hardness minerals, keeping them in solution.

Inline Chlorinator (Klorman)

The inline chlorinator injects chlorine into the water system to:
o Disinfect the water, killing bacteria and other pathogens.

o Oxidize iron, activating the DMI-65 media for effective iron removal.

Integrated Operation

Raw water passes through the sand filter to remove large particulates.
Chlorine from the Klorman unit oxidizes dissolved iron and activates DMI-65.
The DMI-65 media filters out oxidized iron and other metals.
The treated water flows through jumbo filters:
o Activated carbon removes residual chlorine and organic compounds.

o Polyphosphate crystals treat water hardness to prevent scaling.

Econergy Civils Austin K Akv Harriet Zulu Vwaali Craine Habasimbi is readily available to help install this system for you at a reasonable cost.

The Client were handing over a site to  Econergy Civils. The project will involve the construction of 2x50m3 Biodigester...
09/11/2024

The Client were handing over a site to Econergy Civils. The project will involve the construction of 2x50m3 Biodigester, construction of ABR and rehabilitation of 2No ablution blocks for girls and boys. 5Nox10m3 tankstands will also be fabricated at 5 different schools within Lusaka.
Cool challenge for the team

2weeks of continuous rock blasting in Kanyama at  Kanyama West Clinic for a DEWATS. This place is not for the weak souls...
03/11/2024

2weeks of continuous rock blasting in Kanyama at Kanyama West Clinic for a DEWATS. This place is not for the weak souls in trying to solve the sanitation problems. Our team is trying hard to blast within a very tight space to have a permanent solution the facility is currently facing.
In 3days the structure will start showing great progress.

Econergy Civils is preparing a site for construction of a Decentralised Wastewater treatment system at Kanyama west Clin...
17/10/2024

Econergy Civils is preparing a site for construction of a Decentralised Wastewater treatment system at Kanyama west Clinic in Lusaka. Those who knows Lusaka and kanyama very well will attest that the some places are very very rocky and the construction has to take place no matter the matter.
Our team on the ground breaking and blasting the rocks in readiness for construction of a biodigester, ABR and PGF. We hope for the best.

With the way things are going, number of hours of  loadshedding is not coming down any time soon.  Why worry when there ...
28/07/2024

With the way things are going, number of hours of loadshedding is not coming down any time soon. Why worry when there is an alternative solutions to loadshedding? Things will be worse by November. Dont lose business when there is an alternative way of managing loadshedding. Econergy Civils have been installing solar backup systems for Clients that can run 24hrs in an event that ZESCO is down...
Recently our team of engineers managed to install 2 systms for 2 clients in chingola and lusaka.

2No..2 x 5kva installation with 18 x 545w crystalline Solar panels connected in parallel. With 4 x 4.8kw Lithium ion battery.
Inbox us for assessments

Address

Lusaka
10101

Telephone

+260973670886

Website

Alerts

Be the first to know and let us send you an email when Econergy Civils posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Econergy Civils:

Share