ZOASH Civil and Construction Group

ZOASH Civil and Construction Group Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from ZOASH Civil and Construction Group, Construction Company, DEBMAR MALL , Cnr Robson Manyika Avenue & Angwa St. , Office No 15 , First floor, Harare.

ZOASH CONSTRUCTION GROUP LIMITED proudly presents our recently completed Mt Darwin durawall project, demonstrating our d...
08/05/2026

ZOASH CONSTRUCTION GROUP LIMITED proudly presents our recently completed Mt Darwin durawall project, demonstrating our dedication to preserving property value. For further information, please contact our sales representative at +263716808771 or +263719680501.

LASER LEVEL VS LEVELING INSTRUMENT: WHAT SHOULD YOU BUY FIRST?Many people in construction are confused about whether to ...
02/05/2026

LASER LEVEL VS LEVELING INSTRUMENT: WHAT SHOULD YOU BUY FIRST?

Many people in construction are confused about whether to buy a laser level or a leveling instrument first.

The correct answer is simple:
You need both.
But which one you buy first depends on your area of operation.

IF YOU ARE INTO BUILDING CONSTRUCTION

Start with a Levelix laser level machine.

Reason:

Most building activities depend on it:

• Setting out (internal and structural alignment)
• Level transfer between floors
• Block work alignment
• Ceiling and finishing works
• Tiling and fixture alignment

Once you have walls and reference surfaces, the laser becomes extremely efficient and fast.

IF YOU ARE INTO EXTERNAL WORKS

Start with a leveling instrument (automatic level or dumpy level).

Reason:

External works demand accuracy over distance:

• Drainage construction
• Road works
• Site grading
• Foundation level control over large areas

Laser levels struggle in open space outdoors, especially under direct sunlight. Visibility drops, due to direct Sunlight

PRACTICAL SITE REALITY

Even if you focus on building construction, you will still need a leveling instrument because:

• External levels must be established correctly before construction starts
• Formation levels, plinth levels, and drainage must be controlled
• Laser visibility is not good in open space under Sunlight

On the other hand:

• Laser level works anytime indoors and outdoors with standing elements
• It becomes more effective as the building progresses

KEY DECISION RULE

• Building-focused work → Buy Laser Level first
• External works → Buy Leveling Instrument first

But in professional practice:
You cannot operate efficiently without both.

Tools are not optional in construction. They define your output.

• Tools improve accuracy
• Tools increase speed
• Tools build client confidence
• Tools separate professionals from guesswork operators

If you want to grow in this industry, invest in your tools deliberately.

You can start with one and plan towards owning both.

It is wrong for you to be in construction practice for 2 to 4 years without owning at least one of these tools.

It is even worse to be in practice for 5 to 10 years without owning both a laser level and a leveling instrument.

At that point, it is no longer about opportunity. It is about lack of professional seriousness.

Tools are not optional.
They are part of your competence.

Talk to ZOASH CONSTRUCTION GROUP LIMITED Tools on +263787660199/+263719680501

Start owning your tools.



Professionalism starts here:On site, you are not being paid to “be present.”You are being paid to enforce specification ...
13/04/2026

Professionalism starts here:

On site, you are not being paid to “be present.”
You are being paid to enforce specification and standard practice.

That is the difference between a project handled by a professional contractor and one handled by a bricklayer or an untrained contractor.

You are trained.
You understand the reasoning behind what you are doing.

Concrete cover is not decoration.
It is predetermined at design stage for:

• Durability and corrosion protection
• Fire resistance
• Proper bond and load transfer
• Structural stability of reinforcement

So if you are on site and you allow reinforcement to shift to one side, then you have already failed in your responsibility.

If one side has 45 mm cover and the other side has 5 mm, that is not a minor error. That is structural negligence.

As a professional:

• You check alignment before casting
• You monitor during casting
• You confirm after casting

Reinforcement must remain properly centered within the formwork.

In practice, you use:

• Concrete spacers (cover blocks)
• Proper tying and fixing

If needed, adjust at critical points to maintain uniform cover.
Do not guess.
Measure it.

This is one of the simplest site controls, yet it tells everything about your competence.

If you cannot correct this on site, then you are not operating at a professional level.

That is the line.

Always check your standard.

ZOASH CONSTRUCTION GROUP LIMITED, a leading player in Zimbabwe's civil engineering and construction sector, proudly intr...
10/02/2026

ZOASH CONSTRUCTION GROUP LIMITED, a leading player in Zimbabwe's civil engineering and construction sector, proudly introduces its machinery hire services. The available equipment includes: Onsite concrete mixer machine 3m³, Dumpy level machine, Compactor rammer (jumping jack), and Plate compactor. To inquire, please email [email protected], browse www.zoashgroup.co.zw, or call/text +263787660199 (WhatsApp), +263777960943, or +263719680501.

Dream it, I built it for you Whame +263787660199
07/01/2026

Dream it, I built it for you
Whame +263787660199

08/12/2025

Celebrating my 1st year on Facebook. Thank you for your continuing support. I could never have made it without you. 🙏🤗🎉

I am pleased to commemorate my 1st year on Facebook. Thank you for your unwavering support. I am grateful for your contr...
08/12/2025

I am pleased to commemorate my 1st year on Facebook. Thank you for your unwavering support. I am grateful for your contribution to my success. 🙏🤗🎉

I am ASHWIN MURONDAH.I am the CEO and Managing Director of Zoash Construction group Limited.My face might look young, an...
08/12/2025

I am ASHWIN MURONDAH.
I am the CEO and Managing Director of Zoash Construction group Limited.

My face might look young, and that’s perfectly fine.
Don’t judge by appearance.
I might be young, but what I deliver is top-notch, professional, and backed by real experience, both on the field and with modern engineering software.

At Zoash Construction group Limited, our services include:

Architectural Drawings
Structural Designs
Building Construction
Project Management
Land Sales & Documentation
Bill of Quantity (BOQ) Preparation
Site Supervision & Material Management
Renovation & Maintenance Works

Thank you, my fans, I love you all.
Your support keeps this brand moving, and I promise to keep delivering excellence, integrity, and value in every project.

#

Need powerful COMPACTOR RUMMER for your next big BIG PROJECT? ZOASH Construction group has the right compactors for the ...
20/11/2025

Need powerful COMPACTOR RUMMER for your next big BIG PROJECT?

ZOASH Construction group has the right compactors for the job, reliable, efficient, and ready when you are.

NB. ZOASH CONSTRUCTION GROUP also specialize in civil engineering works and construction works, from residential, commercial and industrial construction works

📞 Call us today to book your equipment hire.

construction group rummer #

Address

DEBMAR MALL , Cnr Robson Manyika Avenue & Angwa St. , Office No 15 , First Floor
Harare
00263

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 13:00

Alerts

Be the first to know and let us send you an email when ZOASH Civil and Construction Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share