07/06/2026
WGA is proud to be supporting CBH Group’s rail and train loading infrastructure upgrades at the Brookton receival site, located 135km southeast of Perth.
The existing over-rail out loading facility comprised four 500t over-rail bins and the expansion works will include two additional 5000t V-bottom silos, a high-powered bucket elevator with a tower and bunker, and a replacement elevated over-silo conveyor system to facilitate grain in-loading of 750t/hour.
As lead engineers, WGA is providing civil, mechanical, structural, electrical, controls and instrumentation engineering services from concept design through to construction.
The upgrade will expand permanent storage capacity, improve out-loading efficiency and reduce train turnaround times across the Brookton facility.
Read more about our involvement here: https://wga.com.au/projects/cbh-brookton-rail-outloading-upgrades/