24/08/2026
High-voltage power reactors are not the kind of infrastructure you get a second chance with, so a lift like this requires a comprehensive level of planning and precise ex*****on.
Following an in depth consultation with project stakeholders, significant engineering and approvals, we deployed the 700-tonne Liebherr LTM 1650-8.1 to complete the lifting and precision placement of two units on site for our client.
On a job like this, ground behaviour under load is a key variable, and our crane performed with minimal movement from the outrigger pads, which is notable given the load.
If you have a high-stakes lift in the planning stages, reach out to the Fleurieu Cranes team today.