Evoke Building Group

Directions Website

Evoke Building Group Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Evoke Building Group, Construction Company, 317 Peel Street, Ballarat Central.

📺Now showing on
Builder of the great ⛩ gate
H2 home of the least defects!
🖥️Ballarat Based
💻Geelong office
💻Bendigo office
📌Extensions
📌Renovations
📌Custom projects
📌Outdoor areas
📌Sheds

Little sneak peek of what we have been upto🫣. We’re excited to be moving through the final stages on this project with t...
13/10/2026

Little sneak peek of what we have been upto🫣.
We’re excited to be moving through the final stages on this project with the final fit out currently underway.
We have picked up a few original gems that were restored or we are altering to fit and suit spaces completing this heritage restoration and modern extension.






Herringbone engineered oak floors will be the first feature greeting people at the door on this project.With some help f...
11/10/2026

Herringbone engineered oak floors will be the first feature greeting people at the door on this project.

With some help from illegal child labour Ottis on take your kids to work day otherwise known as being a business owner 😎.
The custom parquetry inlay in the breezeway is complete and we’re now ready to sand stain and polish! .






Completed Ens one of my favourite bathrooms for a while the clients colour scheme really come together to blend in seaml...
09/10/2026

Completed Ens one of my favourite bathrooms for a while the clients colour scheme really come together to blend in seamlessly.
Complemented by beautiful custom joinery manufactured and installed by cutting edge joinery.






09/10/2026

😊

Frame stage.Manufactured frames and trusses hit site to be installed, standing the wall frames on the extension base ins...
08/10/2026

Frame stage.

Manufactured frames and trusses hit site to be installed, standing the wall frames on the extension base installed prior, this stage gives the physically defined space to the two bedrooms, the new bathroom, the alfresco and the double garage.
The frame is tied into the existing home where the new work meets old at the living room where hallway access into the extension will be installed at lock up just before plaster.
Once the frame is braced off and fixed into position, Trusses follow installed to the frames and boundary brickwork with bracketry and bracing to finalize the stage.
This is the stage the plan stops being lines on paper. Room sizes, door openings and the spaces all become real.
Once completed you have the opportunity to walk the rooms gaining better definition of the new spaces.

Next coming in hot is lock up.





Huge shed build completed recently in conjunction with Sammy @  Sg Contracting GroupThe pinnacle of man cave equipment w...
04/10/2026

Huge shed build completed recently in conjunction with Sammy @ Sg Contracting Group
The pinnacle of man cave equipment with a space like this to work out of or on your toys you may as well bang a bed in there!






Windows not cutting it? Upgrade to aluminium double glazing no maintenance and a higher levels of comfort in your home. ...
17/09/2026

Windows not cutting it? Upgrade to aluminium double glazing no maintenance and a higher levels of comfort in your home.






Who knew were such busy little bees 🐝  We are passing through lockup to fix on this designer build working in conjunctio...
14/09/2026

Who knew were such busy little bees 🐝 We are passing through lockup to fix on this designer build working in conjunction with onedesign_ballarat to help create this amazing space for our client studioalexanderbrown






Subfloor & Brickwork, Site action is ramping up with Brick Peers installed made ready for Bearers & Joists & Sewer rough...
10/09/2026

Subfloor & Brickwork, Site action is ramping up with Brick Peers installed made ready for Bearers & Joists & Sewer roughed in for the new bathroom.
We always opt for an enclosed subfloor system for 2 reasons this assists in supporting all external walls and the load baring points in walls where often door & window openings are positioned with the addition of enclosing the R2.5 insulation for a better sealed floor system.
Bricks are recycled solid reds we consistently use the recycled brick look on projects they look great and always blend in with our projects wherever needed.
The wall is being laid for 2 purposes the fire rating on the boundary and the structural component of the coming trusses load baring on the internal skin ( on a timber skid plate ).
This extension will provide 2 additional bedrooms an additional main bathroom alfresco and new double lock up garage for this growing family.






Completion of this lovely design and construct extension & renovation.Here along with the rear extension we knocked out ...
27/08/2026

Completion of this lovely design and construct extension & renovation.
Here along with the rear extension we knocked out 3 walls for the open planned kitchen - dining - living feel - Including adding new built in robe to bedroom 3.
The kitchen is the real centre piece of the area creating a socialised feel in the home the visual pops with Polytec Navy Ultramatt cabinetry it looks great and minimises finger prints!.
Bench tops finished in the beautiful Meganite Blanca Granite to complete the look.

Thanks to our lovely client for the opportunity and as always the team!

Don’t know where to start? We’re here to help, Contact the team today.






Address

317 Peel Street
Ballarat Central, VIC
3350

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Evoke Building Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share