Under Construction Group P/L

Under Construction Group P/L 🚜Bulk and detailed excavation
🚧Civil Earthworks
🚛-Plant Hire, Truck & Dog, Float and everything in between.
🏗️Concrete construction

Quick little pad for some sheep yards. Placed and compacted FCR to grade with the little laser grader. Yards in place re...
21/03/2026

Quick little pad for some sheep yards. Placed and compacted FCR to grade with the little laser grader. Yards in place ready for the first mob 🐑

Stripping top soil after 1/2” of rain  = perfect dust suppressant 👌💃
03/03/2026

Stripping top soil after 1/2” of rain = perfect dust suppressant 👌💃

Couple of street improvements, B2 kerb and channel, drainage , widened road all ready for a 2 coat seal
08/02/2026

Couple of street improvements, B2 kerb and channel, drainage , widened road all ready for a 2 coat seal

Carpark and court construction with the   little grader and sk135   👌💪
01/02/2026

Carpark and court construction with the little grader and sk135 👌💪

House sites filled and trimmed off ! Beautiful!!
21/01/2026

House sites filled and trimmed off ! Beautiful!!

Thanks to all of our team for your mighty effort’s throughout the year. Hope you all get some time to relax with family ...
20/12/2025

Thanks to all of our team for your mighty effort’s throughout the year. Hope you all get some time to relax with family and friends. Seasons greetings one and all! Bring on 2026!

Precast coming in !!!
20/11/2025

Precast coming in !!!

From bulk out to import, compaction to testing. Striving always for quality.
08/11/2025

From bulk out to import, compaction to testing. Striving always for quality.

Mineshaft remediation works. Consisted of a concrete plug to the shaft, blinding cap and completed back up to safe egres...
05/11/2025

Mineshaft remediation works. Consisted of a concrete plug to the shaft, blinding cap and completed back up to safe egress levels with flowable fill. Then placement of controlled fill back to natural surface level. All done safely with access limiting and barrier controls in place.

Upgrade and replacement of a footpath bridge and footpath for . Great result from our dedicated team. Detail on point
04/11/2025

Upgrade and replacement of a footpath bridge and footpath for . Great result from our dedicated team. Detail on point

Upgrade and replacement of a footpath bridge and footpath for . Great result from our dedicated team. Detail on point
04/11/2025

Upgrade and replacement of a footpath bridge and footpath for . Great result from our dedicated team. Detail on point

Address

Po Box 4037
Alfredton, VIC
3350

Alerts

Be the first to know and let us send you an email when Under Construction Group P/L posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share