Barratt Construction

Barratt Construction Alterations, extensions & renovations, bathroom makeovers, new homes. Design, council approvals, build. Boutique builder.

Residential Builder - new homes, alterations and extensions.

Patio enclosure Willerton
06/12/2025

Patio enclosure Willerton

Mt Pleasant - new flooring, bathroom renovation, new kitchen
14/09/2025

Mt Pleasant - new flooring, bathroom renovation, new kitchen

Cottesloe addition (adding a basement room) in confined area - injection grout to 3 sides (Fondex), demo and excavation ...
14/09/2025

Cottesloe addition (adding a basement room) in confined area - injection grout to 3 sides (Fondex), demo and excavation by JV Earthworks. Retaining walls underway

Wilson 2nd floor bathroom reno
14/09/2025

Wilson 2nd floor bathroom reno

Shelly bathroom and laundry with kitchen “scullery” - phase 1Ensuite, new cupboards- phase 2
20/06/2025

Shelly bathroom and laundry with kitchen “scullery” - phase 1
Ensuite, new cupboards- phase 2

Mundijong ensuite, bathroom & laundry renovation. Wall’s reconfigured, new windows, shower area sunk for step down, plum...
24/02/2025

Mundijong ensuite, bathroom & laundry renovation. Wall’s reconfigured, new windows, shower area sunk for step down, plumbing/electrical first fix and walls prepped. Ready for tiling

Beaconsfield - 2nd floor extension.Roof off Thursday 13th Feb, steel beams and part floor Friday, floor and walls Monday...
24/02/2025

Beaconsfield - 2nd floor extension.
Roof off Thursday 13th Feb, steel beams and part floor Friday, floor and walls Monday 17/18th. Scaffold 19/20th. Roof start 21st, roof done 24th. Roof tin measure 25th

Hamilton Hill kitchen and bathroom reno. Out with gas and in with induction cooker, electric oven.Bath shower screen mea...
23/11/2024

Hamilton Hill kitchen and bathroom reno. Out with gas and in with induction cooker, electric oven.
Bath shower screen measured and on its way

Willerton 2 x 2 storey homes underway
12/09/2024

Willerton 2 x 2 storey homes underway

Shelley ensuite - complete strip out, remove door, walls, ceiling, replace all old drainage and water pipes, new concret...
24/06/2024

Shelley ensuite - complete strip out, remove door, walls, ceiling, replace all old drainage and water pipes, new concrete floor, new brick nib wall with shower recess, new sliding door. Tiling and fittings. Just waiting on fluted glass screen to WC

Mt Pleasant ensuite nearly ready for use. Full height tiling throughout with a 1.5x1.5m shower floor area. Skylight adds...
12/05/2024

Mt Pleasant ensuite nearly ready for use. Full height tiling throughout with a 1.5x1.5m shower floor area. Skylight adds extra light to whole area. Created at rear of house to existing bedroom.

Cox Crt - 5 yrs on.  3x2 with brick walls ground floor and timber frame upper floor. Second unit on sub divided block, s...
05/05/2024

Cox Crt - 5 yrs on. 3x2 with brick walls ground floor and timber frame upper floor. Second unit on sub divided block, sub division with design and build to both units.

Address

Beaconsfield, WA
6162

Telephone

+61424175654

Website

Alerts

Be the first to know and let us send you an email when Barratt Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share