04/06/2026
A closer look at the blockwork package out at the Chung Tian Main Temple Project in Priestdale.
Scott talks through what goes into a specified joint sealing scope, from product selection and preparation through to the takeoff and BOQ completed before we arrive on site.
For this package, that includes roughly 4,500 linear metres of blockwork joints, along with undercroft and hardstand works including isolation joints, control joints and saw cuts. Everything is measured and priced upfront to keep the scope clear and avoid variations down the line.
The team is currently working in the main worship area completing the blockwork scope 🧱
We’re using BOSTIK P590 and Bostik Fireban One across the masonry works, both reliable products for this type of install 🔧