27/04/2026
Another blocked stormwater sorted π
Concrete was demoβd and jack hammered to gain access to the issue. Once opened up, we found an old stormflex pipe drilled straight into the top of another line - not a proper connection, which let roots grow through and cause ongoing blockages.
Cut out the defective section and replaced it properly with new 100mm PVC pipework, then backfilled and re-concreted the area.
Done once, done right.
π Jarks Drainage Solutions