27/09/2026
Strong progress this month on the new industrial workshop and two-storey office for BMR. Working closely with our fabrication partner — specialists in large-scale shed construction — the roof structure has been fully assembled at ground level lifted into position via a multi-crane lift, we then followed with 28 tilt panels and a 145m3 slab pour.