15/06/2026
Property here in Yass NSW had recurring floodwater issues at the property entrance, a site assessment was undertaken to determine the most effective long-term solution.
The existing drainage system was removed and replaced with a purpose-built bridgeway crossing, improving water conveyance during heavy rainfall, minimising erosion risk, and ensuring reliable year-round access to the property.