19/06/2026
Part 2 of our Infrastrutuce upgrade for St. George Leagues Club Club project designed by LO-FI.
It consisted of 2 x 1000kva Sub stations now in place installed by Wilken. These feed 2 new 2000A rated MSB’s fitoff with 4 sets of 400mm consumer mains (1360A supply each), ATS Generator Control with Generator Back-up and the 2500A Generator Distribution Board to connect it all.
Then came the fun part...
Cable tray was installed throughout multiple levels of the club for the management of downstream Submain cabling to 16 x Distribution Boards including general light and power, hydraulic and mechanical services.
A precisely planned and well executed project with an extremely rewarding outcome. A job well done to all involved.