Not every site constraint needs to mean compromising on the design.
At our Redfern project, a protected stormwater main running alongside the property presented a significant challenge. Through detailed planning, specialist consultants and a complex Sydney Water approval process, we secured an 850 mm setback, allowing the proposed carport and garage entry to remain part of the design.
The right expertise can make a significant difference to what can be achieved on a challenging site.