Recently, one of our most valued client’s asked us to assist with a D&C job, putting a 40m monopole and a 200m3 monopole foundation in croc infested waters in North QLD... so of course our hands shot straight up for the challenge!!
With some help from our friends at , , and , we managed to facilitate a job which incorporated the installation of 400m2 of self supporting sheet piling and a continuous flow dewatering system, and in the space of 5 days, we;
* Excavated and disposed of ~750t of Acid Sulphate soil,
* Installed a 15t cage that was assembled on site,
* And poured 200m3 (480t) of concrete in a single continuous pour...
From start to finish this job was a MASSIVE challenge, but HARDLINE GROUP hit it head on and handed over the finished product ahead of time and without a single E/O charge... and DEFECT FREE! We even managed to save time & money (and a few limbs) by installing the sheet piling to double as both fall protection, AND Croc protection!
A massive well done to all involved!