TRJ Constructions

TRJ Constructions We specialise in all aspects of residential & commerial construction.

WATERPROOF WEDNESDAY Big thanks to Doug Dorbis Richardson @ DR Waterproofing for cracking through our bathroom build in ...
02/07/2025

WATERPROOF WEDNESDAY
Big thanks to Doug Dorbis Richardson @ DR Waterproofing for cracking through our bathroom build in Nimbin. Stay tuned.

08/03/2025

Hello our beautiful community....

With somewhat of a light at the end of the tunnel after yet another massive shake from mother nature.

We are on call to assist anyone flood affected. Insurance makesafes, trees through your roof, leaking ceilings or got water coming in from god knows where we can fix it no matter how major or minor it is, we are there for you.

We have dealt with hundreds of flood recovery situations especially during the horrific Lismore floods 3 years ago and have all our tools & restoration equipment ready and electrical tagged & checked only 7 days ago so we are ready to go.

Keep in mind we proudly rebuilt 58% of the shops in lismore's CBD & over 35 flood affected homes. So we definitely know our craft.

We are operating & on call 24/7 so please call if you need help with of your needs.

We are a local family owned business and have been for many years.

Most of all stay safe.

Warm regards
TRJ Constructions

From our family to yours, we wish you all a very merry Christmas 🎅and safe new year. Thankyou to all our clients and sup...
24/12/2024

From our family to yours, we wish you all a very merry Christmas 🎅and safe new year.
Thankyou to all our clients and suppliers for your support over 2024 💞

Rounding out 2024 with a bang one of the many flood affected houses moved from North Lismore to Nimbin slowly being rest...
06/12/2024

Rounding out 2024 with a bang one of the many flood affected houses moved from North Lismore to Nimbin slowly being restored to its formal glory first task office, ensuite & laundry extension stay tuned.

Job  #4 Steel frame 77 m2 2nd Dwelling (granny flat) hebel panel exterior cladded.
02/11/2024

Job #4 Steel frame 77 m2 2nd Dwelling (granny flat) hebel panel exterior cladded.

Job  #3 Before & After for a new kitchen in East Lismore.
02/11/2024

Job #3 Before & After for a new kitchen in East Lismore.

Job  #2 framing a extension in Tuntable Falls with a monstrous 5.2 metre high roof line.
02/11/2024

Job #2 framing a extension in Tuntable Falls with a monstrous 5.2 metre high roof line.

Job  #1 Has been a busy few months for the crew we will start with a restump on a flood affected house, in Coraki.
02/11/2024

Job #1 Has been a busy few months for the crew we will start with a restump on a flood affected house, in Coraki.

10/09/2024

We are hiring looking for Qualified/Experienced Carpenters & Hammerhands (Labourers) immediate start, above award pay. Solid work into 2025. Share it round please peoples

22/08/2024

🟡🟢TRJ CONSTRUCTIONS CONTINUE SUPPORTING LISMORE SPEEDWAY TRACK CHAMPIONSHIPS🟢🟡

Lismore Speedway is proud to announce TRJ Constructions as the naming rights sponsor of the 2024/25 Production Sedan Track Championship, continuing their support of Speedway racing as a track championship sponsor in 2023/24.

TRJ Constructions are a local Northern Rivers construction company that specialises in all aspects of residential & commercial construction, house raising & restumping. Being on the ground, supporting locals through the flood recovery and rebuilding phase, TRJ constructions are proud to support local sport and community events.

No job is too big for TRJ Constructions- get in touch today on 0459 709 060

********************

The TRJ Constructions Production Sedan Track Championship will be held over 6 rounds with the first round kicking off on November 16, 2024. This season, with the thanks of TRJ Constructions, the track championship will payout a minimum $3,000 and the promotional team will add $500 each track championship round 20+ cars take the green flag. Drivers will accrue appearance points and feature points across the 6 round Championship culminating over the 2025 Easter Weekend. The top 20 placed drivers will take a percentage of the prize purse, presented at the Lismore Speedway Presentation Night on June 21st, 2025.

Track Championship Supp Regs are available now from the Lismore Speedway website ➡www.lismorespeedway.com.au/competitor-info/

Lismore Automobile Club
Speedway Sedans NSW
Speedway Sedans Queensland

Another one done
13/07/2024

Another one done

🛑 STOP THE CLOCKAnother Job done this gem has been brought back to life after the 2022 Floods. 1.8metres submerged. Ever...
13/07/2024

🛑 STOP THE CLOCK
Another Job done this gem has been brought back to life after the 2022 Floods. 1.8metres submerged. Everything ruined & after all the blood sweat & beers we feel this one looks better then new, restoring it to its former glory right down to its architectural & periodic trims, warm inviting hardwood floors throughout, modern kitchen, bathroom & laundry. Massive French doors facing the massive yard. It was a absolute pleasure completing this job. Big thanks to all our trades who helped get this one over the line. Call us today if you want us to turn your floody or reno done today.

Address

Goonellabah, NSW

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+61459709060

Website

Alerts

Be the first to know and let us send you an email when TRJ Constructions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to TRJ Constructions:

Share