What happens before you actually start building? A lot, and you’re involved from the first conversation.
Before the first machine arrives, we work through more than 100 steps of our process:
1. The first conversations: your scope, budget and any planning hurdles. You don’t need plans drawn up to start.
2. Planning with your designer: we join early, and a qualifying estimate gives you an early picture of the cost before the plans are final.
3. The reports that shape your design: the soil test guides your footings, engineering shapes the structure, the energy report guides your insulation, and the bushfire assessment sets the construction requirements for your site.
4. Contract and permit: Home Warranty insurance is in place before any deposit is requested, and the building permit is issued before construction begins.
5. Lining everything up: trades and suppliers confirmed, the schedule set, and your neighbours introduced to the project.
By the time we start on site, the build is set up to run smoothly. Read the full breakdown on the blog.