Impact build

Call Directions Website Contact the business

Impact build - Renovations - Extensions - New builds
- “Forevor home builders”
- CDB-U 101779
- Master Builders
Call Luke 0421947811 [email protected]

You can tell a lot about a builder from how their team works together.On the Fryerstown straw bale build, the team is cl...
12/11/2026

You can tell a lot about a builder from how their team works together.

On the Fryerstown straw bale build, the team is clearly enjoying working together, and every project is another chance to learn something new and lift the standard a little higher.

Designed by SoS Architects

http://www.impactbd.com.au

11/11/2026

On an Impact Build site, the trades and suppliers are part of the team.

They follow our culture and what we expect on site, and they bring as much organisation and skill as our own crew. For you, it means a site that works like one team, whichever trade is on the tools that day.

http://www.impactbd.com.au

What happens before you actually start building? A lot, and you’re involved from the first conversation.Before the first...
09/11/2026

What happens before you actually start building? A lot, and you’re involved from the first conversation.

Before the first machine arrives, we work through more than 100 steps of our process:

1. The first conversations: your scope, budget and any planning hurdles. You don’t need plans drawn up to start.

2. Planning with your designer: we join early, and a qualifying estimate gives you an early picture of the cost before the plans are final.

3. The reports that shape your design: the soil test guides your footings, engineering shapes the structure, the energy report guides your insulation, and the bushfire assessment sets the construction requirements for your site.

4. Contract and permit: Home Warranty insurance is in place before any deposit is requested, and the building permit is issued before construction begins.

5. Lining everything up: trades and suppliers confirmed, the schedule set, and your neighbours introduced to the project.

By the time we start on site, the build is set up to run smoothly. Read the full breakdown on the blog.

https://www.impactbd.com.au/post/what-happens-before-building-starts

A surveyor’s inspection tells you a build meets the minimum. We like to hold our own work to a higher standard than that...
05/11/2026

A surveyor’s inspection tells you a build meets the minimum. We like to hold our own work to a higher standard than that.

Alongside the mandatory inspections, our team runs its own check at each key milestone of a build. The same thinking guides what we build with, choosing higher performing products wherever we can.

http://www.impactbd.com.au

Frame stage is when an extension starts to feel real, because you can finally stand in the space and see what you’ll be ...
04/11/2026

Frame stage is when an extension starts to feel real, because you can finally stand in the space and see what you’ll be looking at every day.

On this Woodend extension, it’s rolling paddocks and Mount Macedon. It’s a lovely way to get a feel for how the new space will sit with the land around it before the walls close in.

http://www.impactbd.com.au

This Taradale extension looks like it has always been part of the original homestead.Getting that result comes down to t...
02/11/2026

This Taradale extension looks like it has always been part of the original homestead.

Getting that result comes down to the details, from the cladding and rooflines to how the new section meets the old, so the whole home reads as one.

A renovation also lets us improve parts of the original structure while we’re there, so the existing house comes out better too, not just the new space.

http://www.impactbd.com.au

Not many people get to watch their home go up in front of their eyes.On this Fryerstown straw bale build, the owners are...
29/10/2026

Not many people get to watch their home go up in front of their eyes.

On this Fryerstown straw bale build, the owners are on site to see it happen. An experienced lead who has built many straw bale homes is guiding the work, and our team is rising to the challenge and holding every wall to a very high standard.

Designed by SoS Architects

http://www.impactbd.com.au

Will we get to walk through our build before it’s finished? Yes, at several key points along the way.At key stages, we w...
29/10/2026

Will we get to walk through our build before it’s finished? Yes, at several key points along the way.

At key stages, we walk clients through the build so you see it come together with your own eyes:

1. Base stage: the slab or subfloor is complete and you can see where each room will sit.

2. Frame stage: walls up and nothing closed in, so we walk every room to confirm the layout, room sizes and window positions.

3. Outdoor areas: decking and other external works are complete.

4. Driveway and landscaping: the finishing touches outside.

5. Pre-handover: every room, system and outdoor area, with anything you raise actioned before handover.

By handover, you’ve already seen every stage take shape, so the finished home is the result you’ve been following all along.

Which walkthroughs apply depends on the size and type of your project. Read the full breakdown on the blog.

www.impactbd.com.au/post/walk-through-your-build-before-its-finished

27/10/2026

An extension doesn’t need to be complicated to change how a home lives.

This Woodend extension is designed to blend in with the existing weatherboard house, so the new space looks like it belongs from the day it’s finished. What it adds is simple: bigger spaces inside, and a large alfresco area that gives the home more room to spend time outside.

The house keeps the character it started with and works better day to day.

www.impactbd.com.au

Keeping ground moisture away from the straw is the first thing a straw bale wall has to get right.Water can creep upward...
22/10/2026

Keeping ground moisture away from the straw is the first thing a straw bale wall has to get right.

Water can creep upwards from damp ground through the tiny gaps in materials like concrete and timber. To break that path, the base of this wall is filled with scoria, a lightweight volcanic rock. The gaps between the stones are too large for water to climb, and any moisture that does get in can drain away freely.

Designed by SoS Architects

http://www.impactbd.com.au

Address

5/8 Regent Place
Kyneton, VIC
3444

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm
Saturday 6am - 9pm
Sunday 6am - 9pm

Telephone

+61421947811

Alerts

Be the first to know and let us send you an email when Impact build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Impact build:

Shortcuts

Share

Nearby engineering companies