26/08/2026
🌏 FROM THE BLUFF TO THE WORLD — 7.1 MILLION VIEWS
A regional bridge. Two major floods. Millions of people watching across the globe.
The story of the new Bluff Bridge has captured attention far beyond the Clarence Valley, with our project timelapse now reaching an incredible:
👀 7.17 million views
❤️ 402,000+ reactions
💬 2,100+ comments
↗️ 24,500+ shares
🤝 455,000+ interactions
And behind those numbers is one hell of a project.
The Bluff Bridge was delivered through two major flood events, with years of planning and 13 months of construction ultimately captured in just three minutes.
Officially opened to two-way traffic on 29 April 2026, the new bridge rises more than 17 metres above Orara Way and provides a critical connection between Glenreagh, Nana Glen and Grafton.
For BASEC Engineering, it has been pretty incredible to watch a project delivered here in regional NSW spark interest and conversation around the world.
BASEC Engineering was proud to deliver full project management on behalf of Clarence Valley Council, from early development through construction and handover, led by Dean Gregory CPEng NER RPEQ and supported by Gordon Cupitt.
And a project like this takes a team.
A huge congratulations again to everyone who helped bring the Bluff Bridge to life:
▪️ Silverstrand Developments | Civil Construction
▪️ ADG Engineers
▪️ CaSE Civil and Structural Engineering
▪️ SMEC (an SJ Group company)
▪️ Brendan Keane
▪️ EDG Consulting
▪️ BK. Engineering Consulting Solutions
▪️ LB Australia
Two major floods. 13 months of construction. More than 7 million views around the world. 🌉🌏
Not bad for a bridge in regional NSW.
Better management. Better outcomes. 👷♀️
BridgeConstruction CivilConstruction RegionalInfrastructure FloodResilience ProjectDelivery NorthernNSW RegionalNSW InfrastructureProjects EngineeringAustralia