08/10/2026
Another successful rebuild completed and heading back to work.
DZ17, a CAT D10T2, has undergone a midlife rebuild and is now returning to the ABC Heavy Engineering Capcoal Load & Haul team, transported safely to site on the ABC HE Tuff Float.
With heavy engineering, equipment rebuild, specialised lifting and heavy transport capabilities, ABC HE can manage large mining equipment and components from the workshop floor through to final site delivery.
Well done to everyone involved in completing the rebuild and safely transporting DZ17 back to site.