Call Directions Website Contact the business

GMA Experienced Grounds Maintenance & Environmental Specialists serving VIC, NSW, and QLD.

From landscaping to asbestos removal, we ensure safety, quality, and reliability on every project.

Spring sun is already strong enough to cause long-term damage, even when it doesn't feel hot.WorkSafe Victoria advises a...
16/10/2026

Spring sun is already strong enough to cause long-term damage, even when it doesn't feel hot.

WorkSafe Victoria advises avoiding outdoor work during the UV peak of 11am to 3pm, particularly from October to March. UV damage builds up over years, which makes this a good fit for National Safe Work Month's focus on the long-term impact of workplace harm.

Heat adds a second layer of risk. WorkSafe notes that hot conditions don't only cause heat illness. They also lead to trips and falls from fatigue, corners being cut to get out of the heat, and loss of grip on tools with sweaty hands.

What works is planned before the first hot day, not during it: strenuous tasks scheduled for the cooler part of the day, shade and cool water within reach, extra breaks, and crews who can recognise the signs of heat illness in themselves and each other.

For outdoor sites heading into summer, you can trust GMA to plan around the weather rather than work through it.

13/10/2026

A good concrete finish starts well before the concrete arrives on site.

The pour is the part everyone sees, but the work underneath is what determines how it performs. Ground conditions, levels, drainage, compaction and the base all need to be right before the first load arrives.

For external works, that preparation matters even more. Poorly prepared ground can lead to cracking, settlement, ponding and uneven surfaces, turning a straightforward job into a costly repair.

The practical approach is simple: prepare the ground properly, check levels, get the base right, and make sure drainage has been considered before the concrete goes down. Once the pour starts, there is very little room to correct problems underneath it.

Concrete works also need to be coordinated with the rest of the site, from access and excavation to surrounding landscaping and finishing works.

For projects where the concrete needs to perform as well as it looks, you can trust GMA to get the groundwork right.

📞 (03) 5367 0000 🌐 gmaust.com.au

In Victoria, w**d control isn't optional. It's a legal duty that comes with the land.Under the Catchment and Land Protec...
09/10/2026

In Victoria, w**d control isn't optional. It's a legal duty that comes with the land.

Under the Catchment and Land Protection Act 1994, landholders must take all reasonable steps to eradicate regionally prohibited w**ds and to prevent the growth and spread of regionally controlled w**ds on their property. If that isn't happening, a Directions Notice or Land Management Notice can follow.

Spring is when it gets away from you. Weeds are actively growing, and treating them before they set seed is far easier than dealing with next season's germination across the whole site.

GMA Property combines targeted herbicide application, manual removal and preventive measures, so existing w**ds are dealt with and future infestations are less likely.

One more thing worth knowing: the Act also prohibits the movement of noxious w**ds, which is why cleaning down machinery between sites matters as much as the spraying itself.

For sites that need w**ds managed properly rather than just cut back, you can trust GMA to stay on top of them.

📞 (03) 5367 0000 🌐 gmaust.com.au

Slashing is meant to reduce fire risk. Done at the wrong time, it can start one.Spring growth is thick, and it's temptin...
06/10/2026

Slashing is meant to reduce fire risk. Done at the wrong time, it can start one.

Spring growth is thick, and it's tempting to wait until the grass dries off before cutting. CFA's advice is the opposite: slash while the grass is still green or when fire risk is lower, because slashers have been known to start grass fires in dry vegetation.

Once your municipality's Fire Danger Period is declared, engine-driven machinery working within nine metres of vegetation has to be free of faults, fitted with an approved spark arrester and carry a working water extinguisher or knapsack of at least nine litres. On Total Fire Ban days, CFA advises against using farm machinery at all.

GMA Property has extensive experience in broadacre, firebreak and farm slashing across Victoria. The sensible time to book it is before the season turns, not once the paddock has already cured.

For properties that need to be fire-ready before summer, you can trust GMA to get the timing right.

📞 (03) 5367 0000 🌐 gmaust.com.au

02/10/2026

Some of the harm done on work sites doesn't show up on the day. It shows up years later.

October is National Safe Work Month, and this year's theme is 'Safe work is for life'. The figures behind it are hard to ignore: Safe Work Australia reports that 188 workers lost their lives to traumatic injuries in 2024, and there were 146,700 serious workers' compensation claims in 2023–24. That's more than 400 a day.

Asbestos and silica dust are two hazards where the damage builds quietly. By the time it's diagnosed, the exposure happened long ago. That's why containment, wet methods, air monitoring and the right PPE are non-negotiable on our sites.

Throughout October we'll be sharing the practical side of keeping people safe, from dust and sun to mental health.

For projects where safe work has to mean safe for life, you can trust GMA to hold the standard.

As the weather warms up, dry ground turns to dust fast — and an uncontrolled dust cloud is one of the quickest ways to d...
29/09/2026

As the weather warms up, dry ground turns to dust fast — and an uncontrolled dust cloud is one of the quickest ways to draw complaints and compliance issues to an active site.

Dust doesn't just affect visibility. It can carry contaminants off site, irritate neighbouring properties, and put a project's EPA approvals at risk if it isn't managed properly.

GMA builds dust suppression into site management from day one — water carts on stockpile areas, timed watering through the day, and constant monitoring as conditions change.

It's a small, ongoing task that protects the site, the surrounding community, and the project's compliance standing.

For sites heading into the drier months, you can trust GMA to keep dust under control.

A lot of the work that keeps a site compliant happens well before anyone picks up a shovel.GMA holds the licences and ce...
25/09/2026

A lot of the work that keeps a site compliant happens well before anyone picks up a shovel.

GMA holds the licences and certifications that let us take on the work other contractors can't — including Class A and Class B asbestos removal licences, environmental authorisations, and the accreditations that come with working on regulated, EPA-monitored sites.

It's not just paperwork. Those licences set the standard for how every job gets planned, supervised and signed off — and they're what let clients hand over complex, high-risk sites with confidence.

For projects that need more than a quote and a start date, you can trust GMA to bring the credentials to match the work.

The first two weeks on a new site rarely make it into the project photos — but they decide how smoothly everything after...
22/09/2026

The first two weeks on a new site rarely make it into the project photos — but they decide how smoothly everything after them runs.

Site establishment covers the groundwork most people never see: access tracks, site offices, fencing, erosion controls, and getting every safety system in place before the main works begin.

Rushing this stage — or skipping steps to get machinery moving sooner — is one of the most common ways projects run into delays and rework later on.

GMA treats site establishment as its own critical phase, not a formality on the way to the "real" work.

For projects that need to start the right way, you can trust GMA to set the site up properly.

18/09/2026

Most site incidents don't happen because of one big mistake — they happen when people and moving machinery end up in the same space at the same time.

On active civil and remediation sites, clear traffic management is one of the simplest ways to prevent that: defined vehicle routes, exclusion zones around plant, spotters where visibility is limited, and signage that actually gets followed.

GMA plans traffic management into every site from the start, not as an afterthought once machinery's already moving.

It's a straightforward system — but it's one of the most effective ways to keep a busy, multi-crew site safe.

For sites running multiple machines and crews at once, you can trust GMA to keep the movement organised.

You can't tell how well compacted the ground is just by looking at it — and getting it wrong is a problem that only show...
15/09/2026

You can't tell how well compacted the ground is just by looking at it — and getting it wrong is a problem that only shows up later, once something's already built on top of it.

Compaction testing checks that the ground has been compacted to the standard the project actually needs, before slabs are poured, pavements are laid, or structures go up.

Skipping it — or relying on visual inspection alone — is how settling, cracking and costly rework end up on a project months down the line.

GMA tests as it goes, so every stage of earthworks is signed off before the next one starts.

For projects that need proof the ground is ready, not just an assumption, you can trust GMA to check before you build.

Address

13 East Maddingly Road
Maddingley, VIC
3350

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm

Telephone

+61396899999

Alerts

Be the first to know and let us send you an email when GMA posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GMA:

Shortcuts

Share