28/04/2026
Groundwater testing underway for a foreshore project 🌊
Monitoring water levels and collecting samples to prepare for temporary dewatering.
This allows construction to continue below the water table, including a stormwater pump pit, basement foundations, and a car turntable.
Hashtags:
siteworks engineering infrastructure melbourneconstruction basementconstruction