Ever wondered what actually happens before you can start building?
A lot of people think it’s easy — draw some plans and go!
But there are a few important stages that help make sure your project runs smoothly.
1. Design Stage
This is where your ideas come to life.
This stage involves submitting your design to the council for approval, ensuring it complies with zoning, overlays, neighbourhood character, and regulations.
2. Council Town Planning (if required)
Not every project needs this, but when it does, it’s essential.
This stage involves submitting your design to council for approval, ensuring it complies with zoning, overlays, neighbourhood character, and regulations.
Timing can vary depending on the council and the complexity of your project.
3. Construction Plans
Once approvals are in place, we prepare detailed drawings that builders can price and build from.
This stage also involves bringing in external consultants to finalise the technical details required for permits and construction.
So why do you need external consultants?
To get everything approved and built correctly, your project often requires input from specialists:
• Engineers — ensure the structure is safe and buildable
• Soil Reports — determine ground conditions and footing requirements
• Energy Raters — make sure your home meets energy efficiency standards
• And sometimes others, depending on your site
These aren’t just “extras” — they’re essential to avoiding surprises and costly mistakes down the track.
The takeaway?
Good planning upfront = smoother approvals + better build outcomes.
If you’re thinking about renovating, extending, or starting fresh, feel free to reach out for a FREE initial consultation.
We’re happy to guide you through the process.
email - [email protected] or call - 9439 7788