Horizon Heating and Cooling

Horizon Heating and Cooling Having been established November 2015, Horizon offer their comprehensive services to both the domest

29/11/2021

Looking for a helping hand to aid us in the delivery of commercial projects.

Tasks will include creating documents such as SWMs, Excel spreadsheets, and manuals from templates. Plus other administrative jobs such as follow up emails, and helping to organise material procurement and delivery.

A successful candidate will be well organised, computer savvy with knowledge of Microsoft office, and willing to learn more around the industry to develop with the role.

Part time role which may lead to further opportunities such as advancement into project management and/or full time employment.

Couple of MHI bulkhead units installed in two identical shops located in Richmond. Both systems working a charm, ready f...
08/09/2021

Couple of MHI bulkhead units installed in two identical shops located in Richmond. Both systems working a charm, ready for the new proprietors coming into summer!

Looks like we are heading to Ballarat for a few road trips. This project mixes the original old building with the new ye...
28/08/2021

Looks like we are heading to Ballarat for a few road trips. This project mixes the original old building with the new yet existing extension.

Excited to work with a builder we haven't come across since I was a subby a few years back.

This office fit out involves relocation works, as well as a new Mitsubishi ducted system and ventilation for new changing rooms.

Furthermore, we will be centralising and recommissioning all the existing controls and systems, with the view to improving their working climate across the building.

Bring on the 1000mm spiro! It's a shame that once it's sprayed black, you won't know it's there.
20/08/2021

Bring on the 1000mm spiro! It's a shame that once it's sprayed black, you won't know it's there.

Demolition nearing completion at Coles Brighton.... and then the real fun begins!!All ductwork removed safely using a ra...
11/08/2021

Demolition nearing completion at Coles Brighton.... and then the real fun begins!!

All ductwork removed safely using a rated and serviced lifter, exclusion zones and safe work methods.

With new exposed round duct to be reinstated, can't wait to see what great work the guys can produce!

Hard earned pizzas 🍕 on-site at 180 Bank street. Keeping up the carbs 😋
07/08/2021

Hard earned pizzas 🍕 on-site at 180 Bank street. Keeping up the carbs 😋

Job completed at a new Lygon street wine bar.2 cassettes, 4 high walls, a 56kw PAC unit and a Kitchen rangehood for good...
04/08/2021

Job completed at a new Lygon street wine bar.

2 cassettes, 4 high walls, a 56kw PAC unit and a Kitchen rangehood for good measure.

Looking forward to popping in a for a beer in the near future!

Arnolds Creek Kindergarten completed on time and all ready for a warm winter/cool summer.The new space has a great moder...
02/08/2021

Arnolds Creek Kindergarten completed on time and all ready for a warm winter/cool summer.

The new space has a great modern look and is well supported by 2 cassette systems and a high wall for the new office. All working great!

Nice day for a crane lift! Well, somehow we managed to avoid the rain to lift 3,518kgs of equipment, wouldn't believe fr...
29/07/2021

Nice day for a crane lift!

Well, somehow we managed to avoid the rain to lift 3,518kgs of equipment, wouldn't believe from the pics but it rained before and after. MELBOURNE WEATHER!!!

ALL DONE!All 6 systems piped, drained, wired, capped, pressure tested to 4000kpa, vacced to 200 microns and tested.We ev...
17/04/2021

ALL DONE!
All 6 systems piped, drained, wired, capped, pressure tested to 4000kpa, vacced to 200 microns and tested.

We even had time to install another system on the day, though excuse the indoor photo, I locked myself out the room before I remembered to take photos! 😣

All done before the kids are back to school!!!

To be continued...........all the units hung at the school ready for pipe, drain and wiring tomorrow. Hopefully the weat...
16/04/2021

To be continued...........all the units hung at the school ready for pipe, drain and wiring tomorrow. Hopefully the weather is better by then!!

Excited to be helping one of our valued customers in relocating to their new Melbourne offices. Work includes modificati...
03/04/2021

Excited to be helping one of our valued customers in relocating to their new Melbourne offices.

Work includes modification of existing services to suit the new layout, with new ventilation systems and supplementary units being installed to ensure compliance and suitability to their requirements.

Address

Melbourne, VIC
3752

Alerts

Be the first to know and let us send you an email when Horizon Heating and Cooling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share