MAN Civil & Constructions

MAN Civil & Constructions Family-owned civil contractor based in VIC. We deliver start-to-finish solutions for subdivisions, drainage, roads, carparks, water & sewer works.

Accredited with Greater Western Water, Yarra Valley Water, Barwon Water & more.

07/09/2026

A shared path project like this is rarely just a path.
Stage 2 of the Mundy Street shared path for City of Greater Bendigo runs from Railway through to Back Creek, and the scope goes well past surface work. The job includes 180m of new stormwater, 333m of kerb and channel in a mix of plain and bluestone to match Bendigo's existing streetscape, and two raised safety platforms connecting over 850m2 of footpaths across each road.

We’re proud of the finished product and learnt a lot of valuable lessons from building this contract.

http://www.mancivil.com.au/civil-infrastructure

The sewer crew took off for a day to install a new property connection for an unserviced lot, since MAN Civil is an accr...
02/09/2026

The sewer crew took off for a day to install a new property connection for an unserviced lot, since MAN Civil is an accredited Greater Western Water contractor.

If you've bought a property without mains sewer, or need to alter an existing connection, give us a call.

http://www.mancivil.com.au/sewer-water-reticulation

A crossover doesn't get signed off by the builder. It’s a council asset that has to meet the council's standards. The pr...
31/08/2026

A crossover doesn't get signed off by the builder. It’s a council asset that has to meet the council's standards. The process starts before we land on site, identifying individual council standards, permit requirements, obtaining approvals, considering the proposed asset’s surroundings, pedestrian and vehicle traffic management, scheduling inspections and notifying residents.

This crossover and footpath replacement in Glenroy was built for a private builder to Merri-bek City Council standards.

http://www.mancivil.com.au/custom-builds

Luke's been with us since February, and last week he stepped up from Synchro to Non-Synchro HR licence over two days of ...
26/08/2026

Luke's been with us since February, and last week he stepped up from Synchro to Non-Synchro HR licence over two days of training. The instructor told him he was the best student he'd ever had.

Congratulations Luke!

http://www.mancivil.com.au/work-with-us

The teams been busy building another new footpath in Woodend creating safer passages for kids to access the primary. Wet...
24/08/2026

The teams been busy building another new footpath in Woodend creating safer passages for kids to access the primary. Wet winter conditions couldn't slow the them down. Contract delivered for Macedon Ranges Shire Council.

http://www.mancivil.com.au/civil-infrastructure

MAN Civil delivers concrete footpaths, shared user paths, crossovers, in plain and exposed aggregate finishes for counci...
19/08/2026

MAN Civil delivers concrete footpaths, shared user paths, crossovers, in plain and exposed aggregate finishes for councils, developers, and private clients across Victoria. Our scope includes kerb and channel, pram crossings, and pedestrian and cyclist shared paths built to council and authority specification.

These are the paths people use every day, whether that's the school run, the dog walk, or the morning ride, and we take that seriously. We've delivered this work for Macedon Ranges Shire Council, Banyule City Council, Hepburn Shire Council, and City of Greater Bendigo, across residential subdivisions, council capital works, and standalone infrastructure projects.

If you have footpath or crossover works coming up, we'd like to hear from you.

http://www.mancivil.com.au/civil-infrastructure

17/08/2026

At The Greens Estate, 17-Lot Residential Subdivision, part of the sewer main runs through a nature reserve and with flat grades, we brought in a specialist contractor Breakthrough Trenchless to laser bore this section of sewer. This decision was made to minimise the impacts to reserve while ensuring accuracy. Our sewer crew prepared the entry and exit shafts and oversaw the bore on site until they were outside of the reserve area, where open cutting could commence.

More on how this one comes together soon.

http://www.mancivil.com.au/sewer-water-reticulation

Not every civil job is a road or a pipe in the ground.MAN Civil delivers recreational and landscape infrastructure for s...
03/08/2026

Not every civil job is a road or a pipe in the ground.

MAN Civil delivers recreational and landscape infrastructure for schools, councils, and community facilities across Victoria, including sports courts, turfing, and the civil works that support play and recreation spaces. Our half court build for City of Greater Bendigo at Axedale Park is a good example — acrylic-coated concrete, line marking for basketball, soccer, and netball, perimeter fencing, and seating, all delivered to council specification.

If you've got a recreational or community space project on the horizon, we'd like to hear from you.

http://www.mancivil.com.au/civil-infrastructure

31/07/2026

A flashback to the recent Adaptalift Group x JCB launch event - Really goes to show for their size, these machines can still operate millimetre-perfect manoeuvres.

https://www.mancivil.com.au/

Address

1/28 Pioneer Way
New Gisborne, VIC
3437

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 4pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 4pm

Alerts

Be the first to know and let us send you an email when MAN Civil & Constructions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MAN Civil & Constructions:

Shortcuts

Share