Central Avenue Homes

Central Avenue Homes Central Avenue Homes specialises in custom designed homes, for small and difficult blocks, apartment

27/10/2020

Central Avenue Homes have a vacancy for a trainee estimator/scheduler and general building assistant, working from our Yangebup offices.

The role will primarily be involved in the estimating and writing up of detailed quotations for new homes but will also include detailed final quantities and raising purchase orders for homes going to site.

In addition the role will likely extend to providing office based support for the site supervisor and assist with processing invoices for accounts processing.

Building industry exposure would definitely be an advantage but not essential.

Experience with Excel, Word and Outlook will be required along with a strong grasp of basic mathematics and grammar.

The position will initially be casual and based on 20 hours per week with a view to increasing hours and permanency as your skills increase and if the workload requires.

Please email CV and any other relevant information direct to [email protected]

Now that the concrete paving is down, the Alfresco – outdoor cabinets can be installed Once the cabinets are installed, ...
03/07/2020

Now that the concrete paving is down, the Alfresco – outdoor cabinets can be installed
Once the cabinets are installed, the tiler can come back and complete the tiling above the bench

The grano is poured and tape is put across the entry to stop people driving on it and a dropsheet to cover it while the ...
02/07/2020

The grano is poured and tape is put across the entry to stop people driving on it and a dropsheet to cover it while the painter does the garage ceiling/
The paved (or in this case, concreted) areas are prepped ready for the concrete to be delivered.
The Part B pest control is put down just before the concrete is ready to be poured, As it is such a large area, it had to be done on 2 separate days as the concrete goes right around the back of the house.

Once the tiling is finished, the shower screens, mirrors and sliding doors can be measured.The painter starts, and depen...
30/06/2020

Once the tiling is finished, the shower screens, mirrors and sliding doors can be measured.
The painter starts, and dependent on the weather, he may start outside..
The grano hardstand (garage floor) prep and site clean is done, ready to be poured.
Once the grano is down, the garage door can be measured.
Before the painter starts painting he will put dropsheets around to protect the surfaces, If he is painting the walls he may even put plastic over the windows

The tiling will take several days sometimes up to a couple of weeks, it is manual labour and each tile has to be laid in...
29/06/2020

The tiling will take several days sometimes up to a couple of weeks, it is manual labour and each tile has to be laid individually and tiles will have to be cut to fit one at a time.
Here our client wanted to have a feature wall of ceramic tiles flowing from outside to inside as the front entry door is a glazed door, they can be seen from both inside and outside.
Our clients requested full height tiling to all the bathrooms. When we install full height tiling, it is laid to the underside of the cornice.

The tiler comes in and does the screeds to the wet area floors. He will need clean sand and bricks for any hobs and unde...
28/06/2020

The tiler comes in and does the screeds to the wet area floors. He will need clean sand and bricks for any hobs and underneath an wet area cabinets.
Once the screeds are dry, the waterproofer comes and paints the waterproof membrane in the shower recesses.
The waterproofing has takes a couple of days to dry and then the tiler can come back and start laying the tiles.

27/6/20The stone tops are installed, the sinks, troughs and basins are all fitted and final adjustments to any doors and...
27/06/2020

27/6/20
The stone tops are installed, the sinks, troughs and basins are all fitted and final adjustments to any doors and drawers are made.
The rangehood and any strip lighting in or under the cabinets is installed.
The ceiling contractors come back and install any missing cornice.

Sometimes, due to the amount of cabinets in the home, it will take several trips for installation.Even though this is a ...
26/06/2020

Sometimes, due to the amount of cabinets in the home, it will take several trips for installation.
Even though this is a smaller home on a rear strata block, the cabinetwork in the home is extensive, so several trips were needed.
The handles are installed covered with plastic to help stop them getting scratched.
Drawer units and doors are fitted and when they are all on, the cabinetmaker may need to adjust the hinges or rollers, to ensure they are all aligned correctly.
it’s now starting to come together, it looks very stark at the moment as there are no contrasting tops or splashbacks in yet, once they go in, it will make a massive difference.

The electrician will come and pull through the wires ready for the lights and power points, they may even cut holes in t...
23/06/2020

The electrician will come and pull through the wires ready for the lights and power points, they may even cut holes in the ceilings for the exhaust fans.
The cabinets are installed. Generally when there are stone tops, the carcasses, doors and panels are fitted and the stone tops are fitted at a later date.
When there are cabinets that go to the ceiling, the cornice will need to be fitted afterwards, so the ceiling contractors will come back to site and fit the lengths they weren’t able to fit before.

The fixing carpenter fits all the shelving, hanging rails and doors, he will drill the holes for the door handles, and h...
22/06/2020

The fixing carpenter fits all the shelving, hanging rails and doors, he will drill the holes for the door handles, and he will install the front and garage door entry internal only, the remainder aren’t fitted until after the doors have been painted.
Our clients chose a push button deadlock for their home, and there is no handle. The towel rails and toilet roll holders are fitted after the home has been painted, and the fixer will come back and fit the remaining items.

Address

Unit 1/27 Erceg Road YANGEBUP
Perth, WA
6164

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm

Telephone

+61894563366

Alerts

Be the first to know and let us send you an email when Central Avenue Homes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Central Avenue Homes:

Featured

  • BYD B

    BYD B

    22 Olga Road, Maddington

Share