21/05/2026
Samaras Structural Engineers is proud to partner with CPB Contractors in delivering the South Road Tram Overpass Upgrade.
As part of the Tram Grade Separation Projects, this major infrastructure initiative is designed to improve traffic flow, reduce congestion, and strengthen connectivity along one of South Australia’s busiest transport corridors.
Our involvement extended well beyond the workshop floor; from early-stage detailing and engineering through to fabrication, surface treatment, delivery, and final installation. Every stage critical in bringing this complex structural steel package to life.
It’s great to see the elevated Tram Stop 6 at South Road now open to commuters — a successful outcome made possible through the collaboration and effort of all teams involved.
Photo Credits: Department for Infrastructure and Transport