03/10/2025
Have you driven past the new BMW Showroom & MINI Garage on Brighton Rd and thought 🤔 “When did that go up?”
We’re thrilled with how this build turned out for our long-term client Partek Construction & Interiors for Jowett Motor Group, and couldn’t wait to share it. Delivered in two stages; Workshop (Stage 1) and Showroom (Stage 2) — the staged approach allowed the dealership to keep trading right through construction.
Project highlights:
+ $30 million redevelopment spanning approx. 7,000m².
+ Integration of BMW, MINI Garage & Motorrad under one roof.
+ Over 150 tonnes of locally fabricated structural steel.
+ More than 2,000 individual steel assemblies detailed, fabricated, and erected from our Port Adelaide workshop.
+ Built with sustainability in mind, including solar panels, rainwater harvesting, and energy-efficient glazing.
+ Designed and staged to maintain full dealership operations throughout the build.
The exposed steelwork was a key design feature — giving the space its bold, modern aesthetic that aligns perfectly with the BMW Group brand...!
🎥 Watch the construction come to life: https://lnkd.in/gK9gZWA5 or better yet, check it out in person next time you’re on Brighton Rd. Video courtesy of Glenelg BMW ****on